DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER 20, 2011 Fall 2011 Rev A
2
PRESENTATION OVERVIEW Mission Overview Design Organizational Chart Schedule Budget Design Concerns
3
MISSION OVERVIEW OBJECTIVE To investigate high altitude power generation using the kinetic motion of the balloon and a generator based on the parabolic curve of a pendulum Most turbulent parts of flight will produce more electric voltage and current To capture video and images from space EXPERIMENT POTENTIAL: Provide means for alternative source of energy and power Information on kinetic energy during flight indirectly indicates mechanical stress, influencing future structures Getting back memorable pictures and video
4
DESIGN OVERVIEW
5
KINETIC ENERGY GENERATOR (K.E.G) Primary payload of Dynamo Parabolic track emulates the path of a pendulum Magnets swing next to copper coils to induce current The testing process (Section 2.7) assesses the function of K.E.G. in the turbulent flight environment Voltage data collected via LASCAR EL-USB-3 data logger each second
6
DESIGN OVERVIEW Structure: Foam core, hot glue, aluminum tape LASCAR Voltage USB logger Connected to positive and negative feeds of generator Logs data with specified rate and start time Data stored on the USB, retrieved through PC-USB compatible software HOBO Data Logger Measures internal/external temperatures, humidity Data retrieved shall be correlated with altitude information Activated with external switch Image and Video Canon A780 Camera programmed to record images and video at select time intervals
7
DESIGN OVERVIEW
8
ORGANIZATIONAL CHART Gabrielle Massone Team Leader C&DH Corey Wilson Structural Design Dalton Smith Structural Design Adam Kemp Generator Design J.J. Busse Science and C&DH Emily Eggers Business Power and Data Glenda Alvarenga Power and Data Collection GABRIE LLE J. J ADA M DALTO N GLEN DA COR EY EMI LY
9
DATESCHEDULE 9/13/2011Team Meeting (9-9:30am) 9/14/2011Team Meeting (5-8pm) 9/15/2011Team Meeting (4:30-7pm) 9/16/2011Complete and turn in Proposal 9/19/2011Complete Conceptual Design Review (CoDR) 9/20/2011Turn in CoDR and give presentation 9/22/2011Team Meeting (4-6pm) 9/23/2011Turn in order form for mechanical components 9/27/2011Receive mechanical components 9/26-30/2011Assemble satellite structure and generator 9/29/2011Team Meeting (4-6pm) 10/3/2011Complete Design Document Revisions A/B and CDR 10/4/2011DD Revisions A/B and CDR due 7:00 am 10/3-7/2011Structure Testing (whip, kick, and drop tests) 10/6/2011Team Meeting (4-6pm) 10/10-14/2011General motion tests (vibration/oscillation of generator) 10/13/2011Team Meeting (4-6pm) 10/20/2011Team Meeting (4-6pm) 10/24/2011Complete testing; final satellite and generator completed 10/25/2011Pre-launch inspection 10/27/2011In-class mission simulation test; Team Meeting (4-6pm) 11/1/2011Launch Readiness Review (LRR) presentation due at 7:00 am 11/1/2011Design Document Revision C due at 7:00 am 11/3/2011Team Meeting (4-6pm) 11/4/2011Final Dynamo satellite weigh-in and turn-in 11/5/2011Launch Day (4:45am-TBD) 11/5-28/2011Data analysis and compilation 11/29/2011Final team presentation and report 12/3/2011Integrated Technology and Learning Laboratory (ITLL) Design Expo
10
BUDGET
11
BIGGEST WORRIES… Generator: Malfunctions Lack of energy generation due to design flaws Magnetic components interfering with electronics Structure: Unable to handle the rigors of flight Staying connected to GPS unit, from which altitude data is derived Being over budgeted weight/cost once construction begins Malfunctions of any other electronic components, switches, wiring, solder joints, etc…