DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER.

Similar presentations


Presentation on theme: "DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER."— Presentation transcript:

1 DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER 20, 2011 Fall 2011 Rev A

2 PRESENTATION OVERVIEW  Mission Overview  Design  Organizational Chart  Schedule  Budget  Design Concerns

3 MISSION OVERVIEW OBJECTIVE  To investigate high altitude power generation using the kinetic motion of the balloon and a generator based on the parabolic curve of a pendulum  Most turbulent parts of flight will produce more electric voltage and current  To capture video and images from space EXPERIMENT POTENTIAL:  Provide means for alternative source of energy and power  Information on kinetic energy during flight indirectly indicates mechanical stress, influencing future structures  Getting back memorable pictures and video

4 DESIGN OVERVIEW

5 KINETIC ENERGY GENERATOR (K.E.G)  Primary payload of Dynamo  Parabolic track emulates the path of a pendulum  Magnets swing next to copper coils to induce current  The testing process (Section 2.7) assesses the function of K.E.G. in the turbulent flight environment  Voltage data collected via LASCAR EL-USB-3 data logger each second

6 DESIGN OVERVIEW  Structure:  Foam core, hot glue, aluminum tape  LASCAR Voltage USB logger  Connected to positive and negative feeds of generator  Logs data with specified rate and start time  Data stored on the USB, retrieved through PC-USB compatible software  HOBO Data Logger  Measures internal/external temperatures, humidity  Data retrieved shall be correlated with altitude information  Activated with external switch  Image and Video  Canon A780 Camera programmed to record images and video at select time intervals

7 DESIGN OVERVIEW

8 ORGANIZATIONAL CHART Gabrielle Massone Team Leader C&DH Corey Wilson Structural Design Dalton Smith Structural Design Adam Kemp Generator Design J.J. Busse Science and C&DH Emily Eggers Business Power and Data Glenda Alvarenga Power and Data Collection GABRIE LLE J. J ADA M DALTO N GLEN DA COR EY EMI LY

9 DATESCHEDULE 9/13/2011Team Meeting (9-9:30am) 9/14/2011Team Meeting (5-8pm) 9/15/2011Team Meeting (4:30-7pm) 9/16/2011Complete and turn in Proposal 9/19/2011Complete Conceptual Design Review (CoDR) 9/20/2011Turn in CoDR and give presentation 9/22/2011Team Meeting (4-6pm) 9/23/2011Turn in order form for mechanical components 9/27/2011Receive mechanical components 9/26-30/2011Assemble satellite structure and generator 9/29/2011Team Meeting (4-6pm) 10/3/2011Complete Design Document Revisions A/B and CDR 10/4/2011DD Revisions A/B and CDR due 7:00 am 10/3-7/2011Structure Testing (whip, kick, and drop tests) 10/6/2011Team Meeting (4-6pm) 10/10-14/2011General motion tests (vibration/oscillation of generator) 10/13/2011Team Meeting (4-6pm) 10/20/2011Team Meeting (4-6pm) 10/24/2011Complete testing; final satellite and generator completed 10/25/2011Pre-launch inspection 10/27/2011In-class mission simulation test; Team Meeting (4-6pm) 11/1/2011Launch Readiness Review (LRR) presentation due at 7:00 am 11/1/2011Design Document Revision C due at 7:00 am 11/3/2011Team Meeting (4-6pm) 11/4/2011Final Dynamo satellite weigh-in and turn-in 11/5/2011Launch Day (4:45am-TBD) 11/5-28/2011Data analysis and compilation 11/29/2011Final team presentation and report 12/3/2011Integrated Technology and Learning Laboratory (ITLL) Design Expo

10 BUDGET

11 BIGGEST WORRIES…  Generator:  Malfunctions  Lack of energy generation due to design flaws  Magnetic components interfering with electronics  Structure:  Unable to handle the rigors of flight  Staying connected to GPS unit, from which altitude data is derived  Being over budgeted weight/cost once construction begins  Malfunctions of any other electronic components, switches, wiring, solder joints, etc…


Download ppt "DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER."