Presentation is loading. Please wait.

Presentation is loading. Please wait.

CompanyLocation DC Cost ($M) DC Size* (MW) NSA (July ‘09)Camp Williams, UT$2,000130 Apple (May ‘09)Maiden, NC$1,00065 Social Security Admin (Feb ‘09)

Similar presentations


Presentation on theme: "CompanyLocation DC Cost ($M) DC Size* (MW) NSA (July ‘09)Camp Williams, UT$2,000130 Apple (May ‘09)Maiden, NC$1,00065 Social Security Admin (Feb ‘09)"— Presentation transcript:

1

2

3 CompanyLocation DC Cost ($M) DC Size* (MW) NSA (July ‘09)Camp Williams, UT$2,000130 Apple (May ‘09)Maiden, NC$1,00065 Social Security Admin (Feb ‘09) Baltimore, MD$40027 Facebook (Feb ‘10)Princeville, OR$21515 Internet Villages (July ‘09)Annandale, Scotland$1,600107 Lockerbie Data Centers (Dec ‘09) Lockerbie, Scotland$1,500100 Next Generation Data (Mar ‘10) Wales, UK$30120 DATA CENTER PROJECTS (LAST 12 MO.) Source: Company press releases * Estimates based on $15M/MW build out cost

4

5 BING SEARCHES – Japan VS. Great Britain Source: Microsoft

6 turbotax.com taxcut.com hrblock.com taxact.com Source: Alexa ~4x normal load (Holiday shopping) ~10x normal load (Tax season) target.com walmart.com toysrus.com barnesandnoble.com Source: Alexa

7

8

9 Midsize Company Example

10 BUSINESS APPS COLLABORATIONSTORAGEPLATFORMMANAGEMENTPRODUCTIVITY COMMUNICATIONS

11

12

13 Usage Compute Time Average Inactivity Period Compute Time Average Usage Compute Time Compute Time Average Usage

14

15 $0.15 per GB for data transfers from European & North American locations $0.20 per GB for data transfers from other locations $0.01 per 10,000 transactions

16

17 “We’re using Windows Azure to meet the evolving needs of our clients. And with the … reduced levels of new investment required, we can consider solutions that might otherwise not have been possible.” Rob Fraser, Head of Cloud Computing, RiskMetrics

18 “This has been one of the best IT partner projects CCE has experienced, and we have the added value of a longer IT roadmap with Microsoft than if CCE had built the solution on premises.” Kevin Flowers, Director of Enabling Technologies, CCE

19 “Our first estimates show that we can reduce our TCO by a factor of 10. The software distribution system we built with Windows Azure is 10 times cheaper than our previous solution.” Elmar Stoecker, Director Portfolio Management, Siemens IT Solutions and Services

20 Unified Programming Platform and Tools.NET 4 & Visual Studio 2010 ASP.NET, ASP.NET MVC,.NET 3.5 Unmanaged Code, Java, & PHP Visual Studio 2008, Eclipse Support Improved compatibility between on-premise applications and Windows Azure applications via support for VMs and other methods Simplified Management Improved management APIs Automated service management Improved interoperability with System Center and APIs for integration with mainstream management tools like OpenView and Tivoli Flexible and Trustworthy Storage Windows Azure Storage Non-relational table storage Blogs, Queues, Drives SQL Azure SQL Azure databases, up to 10GB Windows Azure Storage Automatic data geo-replication SQL Azure Larger database sizes for SQL Azure On premise and cloud data sync Efficient Networking Communicate between cloud and on premise with Windows Azure platform AppFabric Improvements in flexibility and responsiveness Global Platform 6 Data Centers in US, EMEA, APAC Data Centers 18 CDN Nodes Additional locations and CDN nodes Global Traffic Management Capabilities Compliance Various standards under investigation Important new security and compliance certifications Adaptable Pricing Models Consumption and Commitment pricing Integration with MS Volume Licensing

21

22


Download ppt "CompanyLocation DC Cost ($M) DC Size* (MW) NSA (July ‘09)Camp Williams, UT$2,000130 Apple (May ‘09)Maiden, NC$1,00065 Social Security Admin (Feb ‘09)"

Similar presentations


Ads by Google