AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3.

Similar presentations


Presentation on theme: "AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3."— Presentation transcript:

1 AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3

2 AAE450 Spring 2009 [Solomon Westerman][PM] Page 2/3 Total Cost ($M USD) Launch4.4 R&D2.3 Integration4.9 Purchase7.2 Overhead8.0 Total26.9 GLXP Prize ($M USD) Grand Prize20.0 Lunar Night1.0 Total21.0 Lose $5.9 M in 2012 USD!

3 AAE450 Spring 2009 $/kg Dry Lander on Surface 100g$295,000 10kg$257,000 Arbitrary$126,000 [Solomon Westerman][PM] Page 3/3 $/kg Payload to Lunar Base First Launch$170,000 Marginal Cost$168,000

4 AAE450 Spring 2009 Backup Slides [Solomon Westerman][PM]

5 AAE450 Spring 2009 Costing Model Differences 1.Overhead –100g, 10kg 15 engineers @ 3 years @ 150k each 3 STK license, 15 MATLAB license –Arbitrary 100 engineers @ 3 years @ 150k each 10 STK license, 75 MATLAB license 2.R&D –100g, 10kg 20 Engineers @ 150k salary each + 50k per month equipment increases reliability by 2% per month –Arbitrary 40 Engineers @ 150k salary each + 50k per month equipment increases reliability by 2% per month 3.Integration –100g, 10kg $10k / kilogram –Arbitrary $10k / kilogram [Solomon Westerman][PM]


Download ppt "AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3."