1 Roughness Correction Working Group Report July 21, 2010 Seattle 6 th Aquarius/SAC-D Science Team meeting

2 Membership S. Brown R. Lang D. LeVine L. Jones D. Vandenmark, B. Chapron F. Wentz S. Yueh Peter Naoto Carl Liang Alex Fred Josehph Emmanuel Add others

3 Roughness Working Group Charter Provide and validate algorithms to compute L- band Tb offset due to surface roughness

4 Strawman Plan Pre-Launch: Now until April 2011 – SMOS data analysis for Aquarius pre-launch model – Generate software tools for post-launch data analysis – Calibration site selection In Orbit Checkout (IOC): L+45 days – Assess the reasonableness of instrument performance Telemetry Analysis: Time series of system noise, temperature, voltage and current – Quick analysis of pointing – Quick analysis of TB and sigma0 quality – Quick model assessment – Daily/Weekly Status? – Data available from L+25 to L+45, about 2 weeks of data

5 Strawman Plan Cal/val phase (L+6 months) – Calibration bias removal – in coordination with cal WG Pointing angle analysis using TB and sigma0 changes along land/sea crossings TB stability and drift analysis correction in coordination with Rad Cal WG Sigma0 calibration stability Aq TB-SMOS-TB cross-over comparison (doug) – Develop model function and correction TB model function (wind, SST, and wave matchup) Sigma0 model function (Aquarius, NCEP wind, SST, and wave matchup) TB-sigma0 model function (Aquarius, NCEP, SST, and wave matchup) Alternate wind products for matchup: ecmwf, ssmi wind, no-gap, ncep reanalysis, oceansat-2, windsat, (Fred et al. carl, Linny for ssmi matchup, and simon) – Assess roughness correction algorithms Baseline: SSS= aTB+bSST+cW Various combinations of NCEP wind, sigma0, sigma0-wind, MWR-wind, wave height, and mss – MWR Wind becomes available from CONAE: 5 mos after launch – MWR rain flag available in L+30 days (Linny) – Iterations of steps above – BiWeekly status/tagup – Fact-to-face workshops (L+3 and L+5) – Reach consensus on correction algorithm and report to science team

6 Working Group Plan Biweekly Telecon Aquarius Forum information exchange and Wiki for FAQ and information depository Face-to-face meetings (L-1, L+3 and L+5)