Radiation Physics Beam Tests J. Bauer, J. Liu, L. Nicolas, S. Rokni, M. Santana ESTB Workshop 2011 March 17, 2011
2
Introduction -RP has been a user of primary and secondary beams at SLAC test beam facilities (FFTB, ESA). Last experiments were T489, T493 -RP also conducted experiments at other labs, e.g. CERN (CERF) and PAL (PHERF) -Previous collaborations with KEK, PAL, CERN and Tsinghua -The main purpose is benchmarking of Monte Carlo codes that are used in the design/optimization of facilities (personal and environmental radiation protection) 2 ESTB Workshop 2011, March 17, 2011
3
Recent related research examples (I) Irradiation experiment T489 (28 GeV) at ESA. Benchmarking of activation and residual dose rates 3 ESTB Workshop 2011, March 17, 2011
4
Recent related research examples (II) Irradiation experiment (2.5 GeV) at PHERF in Pohang Accelerator Laboratory (S. Korea) to study activation of environmental samples and benchmark FLUKA Monte Carlo intra-nuclear cascade code. Analysis is under way. Further experiments seem necessary to better understand possible FLUKA underestimation of 3 H generation as well as of some other radio-isotopes 4 ESTB Workshop 2011, March 17, 2011
5
Areas of interest -Activation and damage measurements -Activation of accelerator components and environmental samples -Damage to electronics and magnets -Shielding measurements: attenuation of muons, neutrons, etc -Measurements of radiation source terms: -Photomuon production: Crucial for shielding of HE e- beams at zero degree angles (e.g. LCLS) -Neutron spectra measurements at HE (TOF) -Photonuclear production, angular spectra. 5 ESTB Workshop 2011, March 17, 2011
6
3 experiments in 3 years -Activation and damage measurements -Activation of accelerator components and environmental samples -Damage to electronics and magnets -Shielding measurements: attenuation of muons, neutrons, etc -Measurements of radiation source terms: -Photomuon production: Crucial for shielding of HE e- beams at zero degree angles (e.g. LCLS) -Neutron spectra measurements at HE (TOF) -Photonuclear production, angular spectra. 1 2 3 6 ESTB Workshop 2011, March 17, 2011
7
1) Activation & damage experiment Beam parametersValueComments Particle Type e- Energy 4.0 GeV, 13 GeV Rep Rate Total: 1E16 e- Preferably ~30 W Charge per pulse Energy Spread Bunch length rms Beam spot size, x-y Known within 5 % Others (emittance, …) Total charge known within 2 % LogisticsRequirements Space requirements (H x W x L) 5 m width x 5 m length Duration of Test and Shift Utilization 1 week Desired Calendar Dates Q1 2012 7 ESTB Workshop 2011, March 17, 2011
8
2) Muon production & shielding Beam parametersValueComments Particle Type e- Energy 4 GeV, 13 GeV Rep Rate Max available Charge per pulse Max available Energy Spread Known within 5 % Bunch length rms Beam spot size, x-y Known within 5 % Others (emittance, …) Total charge known within 2 % LogisticsRequirements Space requirements (H x W x L) 20 m length Duration of Test and Shift Utilization 10 days Desired Calendar Dates Q1 2013 8 ESTB Workshop 2011, March 17, 2011
9
3) Photo-neutron measurements Beam parametersValueComments Particle Type e- Energy100 MeV, 4 GeV, 10 GeV Rep Rate10-120 Hz Charge per pulseMax availableMonitored Energy Spread Bunch length rms Beam spot size, x-y Others (emittance, …)Total charge known within 2% LogisticsRequirements Space requirements (H x W x L) m x 10 m x 10 m Duration of Test and Shift Utilization 2 weeks Desired Calendar Dates Q1 2014 9 ESTB Workshop 2011, March 17, 2011