Welcome.. Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions.

Similar presentations


Presentation on theme: "Welcome.. Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions."— Presentation transcript:

1 Welcome.

2 Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions at any time, please choose or see bimex.wikispaces.com.

3 Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions at any time, please choose or see bimex.wikispaces.com. Continue

4 Guide Continue Back Q0. Project Information

5 Guide Continue Back Q0. Project Information Continue

6 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: Guide Continue Back

7 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: Guide Continue Back Building

8 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Guide Continue Back Building

9 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM Guide Continue Back Building

10 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA 16802 Guide Continue Back Building

11 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA 16802 Guide Continue Back Building Residential Commercial Industrial Institutional Residential Commercial Industrial Institutional

12 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA 16802 Guide Continue Back Building Residential Commercial Industrial Institutional Residential Commercial Industrial Institutional

13 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA Institutional 16802 Guide Continue Back Building

14 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA Institutional 16802 Guide Continue Back Building Planning Design Construction Operations Planning Design Construction Operations

15 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA Institutional 16802 Guide Continue Back Building Planning Design Construction Operations Planning Design Construction Operations

16 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA Planning Institutional 16802 Guide Continue Back Building

17 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA Planning Institutional 16802 Guide Continue Back Building IPD DBB DBB with CM IPD DBB DBB with CM

18 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA Planning Institutional 16802 Guide Continue Back Building IPD DBB DBB with CM IPD DBB DBB with CM

19 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA Planning Institutional 16802 Guide Continue Back IPD Building

20 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA Planning Institutional 16802 Guide Continue Back IPD Building Lump Sum GMP Unit Price Lump Sum GMP Unit Price

21 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA Planning Institutional 16802 Guide Continue Back IPD Building Lump Sum GMP Unit Price Lump Sum GMP Unit Price

22 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA Planning Institutional 16802 Guide Continue Back IPD Building Unit Price

23 Q0. Please provide the following project information: Project Name: Project Number: Project Leader: Project Location: Facility Type: Project Phase: Delivery Method: Contract Type: 999.000 (01) Jim McBIM 1234 Street University Park PA Planning Institutional 16802 Guide Continue Back IPD Building Unit Price Continue

24 Guide Continue Back Q1.0 Project Inputs Q1.1 Project Characteristics Q1.2 Team Characteristics Q1.3 Organization Characteristics

25 Guide Continue Back Q1.0 Project Inputs Q1.1 Project Characteristics Q1.2 Team Characteristics Q1.3 Organization Characteristics Continue

26 Guide Continue Back Q1.1 Project Characteristics Q1.1A Market Characteristics Q1.1B Land Characteristics Q1.1C Building Characteristics

27 Guide Continue Back Q1.1 Project Characteristics Continue Q1.1A Market Characteristics Q1.1B Land Characteristics Q1.1C Building Characteristics

28 Q1.1A Please prioritize the following project characteristics: Guide Continue Back Market Characteristics 195 1 being of lowest priority, 9 being highest. Project Risk Level 1 Level 2 Level 3

29 Q1.1A Please prioritize the following project characteristics: Guide Continue Back Market Characteristics 195 1 being of lowest priority, 9 being highest. Project Risk Level 1 Level 2 Level 3

30 Q1.1A Please prioritize the following project characteristics: Guide Continue Back Market Characteristics 195 1 being of lowest priority, 9 being highest. Project Risk Level 1 Level 2 Level 3 Continue

31 Q1.1B Please prioritize the following project characteristics: Guide Continue Back Land Characteristics 1 being of lowest priority, 9 being highest. 195 Site Restricted Site Unpredictable Weather Contaminated soil High Water Table Restrictions Zoning Restrictions Height Control Traffic Control 195

32 Q1.1B Please prioritize the following project characteristics: Guide Continue Back Land Characteristics 1 being of lowest priority, 9 being highest. 195 Site Restricted Site Unpredictable Weather Contaminated soil High Water Table Restrictions Zoning Restrictions Height Control Traffic Control 195

33 Q1.1B Please prioritize the following project characteristics: Guide Continue Back Land Characteristics 1 being of lowest priority, 9 being highest. 195 Site Restricted Site Unpredictable Weather Contaminated soil High Water Table Restrictions Zoning Restrictions Height Control Traffic Control 195 Continue

34 Q1.1C Please prioritize the following project characteristics: Guide Continue Back Building Characteristics 1 being of lowest priority, 9 being highest. 195 Schedule Critical Non Critical Cost Critical Non Critical Quality Level Level 1 Level 2 Level 3 Building High End Space Stake Holder Input Tie into Existing facility Intensive MEP Repetitious Floor Design 195 195 195

35 Q1.1C Please prioritize the following project characteristics: Guide Continue Back Building Characteristics 1 being of lowest priority, 9 being highest. 195 Schedule Critical Non Critical Cost Critical Non Critical Quality Level Level 1 Level 2 Level 3 Building High End Space Stake Holder Input Tie into Existing facility Intensive MEP Repetitious Floor Design 195 195 195

36 Q1.1C Please prioritize the following project characteristics: Guide Continue Back Building Characteristics 1 being of lowest priority, 9 being highest. 195 Schedule Critical Non Critical Cost Critical Non Critical Quality Level Level 1 Level 2 Level 3 Building High End Space Stake Holder Input Tie into Existing facility Intensive MEP Repetitious Floor Design 195 195 195 Continue

37 Guide Continue Back Q1.2 Team Characteristics

38 Guide Continue Back Q1.2 Team Characteristics Continue

39 Q1.2 Please prioritize the following team characteristics: Guide Continue Back Team Skills 1 being of lowest priority, 9 being highest. Design Communication Leadership Modeling Navigation 195 System Analysis Leadership Modeling Navigation 195 Scheduling Leadership Modeling Navigation 195 Estimating Leadership Modeling Navigation 195

40 Q1.2 Please prioritize the following team characteristics: Guide Continue Back Team Skills 1 being of lowest priority, 9 being highest. Design Communication Leadership Modeling Navigation 195 System Analysis Leadership Modeling Navigation 195 Scheduling Leadership Modeling Navigation 195 Estimating Leadership Modeling Navigation 195

41 Q1.2 Please prioritize the following team characteristics: Guide Continue Back Team Skills 1 being of lowest priority, 9 being highest. Design Communication Leadership Modeling Navigation 195 System Analysis Leadership Modeling Navigation 195 Scheduling Leadership Modeling Navigation 195 Estimating Leadership Modeling Navigation 195 Continue

42 Guide Continue Back Q1.3 Organization Characteristics Q1.3A Owner Q1.3B Architect/Engineer Q1.3C Contractor Q1.3D Facility Manager

43 Guide Continue Back Q1.3 Organization Characteristics Continue Q1.3A Owner Q1.3B Architect/Engineer Q1.3C Contractor Q1.3D Facility Manager

44 Q1.3A Please prioritize the following organization characteristics: Guide Continue Back Owner 1 being of lowest priority, 9 being highest. Technological Development IT Department Training 195 Access to Hardware/Software Design Communication System Analysis Scheduling Estimating 195

45 Q1.3A Please prioritize the following organization characteristics: Guide Continue Back Owner 1 being of lowest priority, 9 being highest. Technological Development IT Department Training 195 Access to Hardware/Software Design Communication System Analysis Scheduling Estimating 195

46 Q1.3A Please prioritize the following organization characteristics: Guide Continue Back Owner 1 being of lowest priority, 9 being highest. Technological Development IT Department Training 195 Access to Hardware/Software Design Communication System Analysis Scheduling Estimating 195 Continue

47 Q1.3B Please prioritize the following organization characteristics: Guide Continue Back Architect/Engineer 1 being of lowest priority, 9 being highest. Technological Development IT Department Training 195 Access to Hardware/Software Design Communication System Analysis Scheduling Estimating 195

48 Q1.3B Please prioritize the following organization characteristics: Guide Continue Back Architect/Engineer 1 being of lowest priority, 9 being highest. Technological Development IT Department Training 195 Access to Hardware/Software Design Communication System Analysis Scheduling Estimating 195

49 Q1.3B Please prioritize the following organization characteristics: Guide Continue Back Architect/Engineer 1 being of lowest priority, 9 being highest. Technological Development IT Department Training 195 Access to Hardware/Software Design Communication System Analysis Scheduling Estimating 195 Continue

50 Q1.3C Please prioritize the following organization characteristics: Guide Continue Back Contractor 1 being of lowest priority, 9 being highest. Technological Development IT Department Training 195 Access to Hardware/Software Design Communication System Analysis Scheduling Estimating 195

51 Q1.3C Please prioritize the following organization characteristics: Guide Continue Back Contractor 1 being of lowest priority, 9 being highest. Technological Development IT Department Training 195 Access to Hardware/Software Design Communication System Analysis Scheduling Estimating 195 Continue

52 Q1.3D Please prioritize the following organization characteristics: Guide Continue Back Facility Manager 1 being of lowest priority, 9 being highest. Technological Development IT Department Training 195 Access to Hardware/Software Design Communication System Analysis Scheduling Estimating 195

53 Q1.3D Please prioritize the following organization characteristics: Guide Continue Back Facility Manager 1 being of lowest priority, 9 being highest. Technological Development IT Department Training 195 Access to Hardware/Software Design Communication System Analysis Scheduling Estimating 195 Continue

54 Guide Continue Back Q2. BIM Uses

55 Guide Continue Back Q2. BIM Uses Continue

56 Existing Conditions Modeling Programming Site Selection Preliminary Cost Estimation Phase Planning Site Analysis Constructability Review 3D Design Coordination Virtual Mock-ups Code Checking Engineering Analysis Emergency Evacuation Planning Security Validation Sustainability (LEED) Evaluation 3D Coordination Digital Fabrication 3D Control and Planning 3D System Design Unit Price Estimation 4D Planning Site Utilization Planning Record Model Asset Management Space Management/Tracking Disaster/Emergency Planning Building Performance Analysis Maintenance Cost Estimation Building Maintenance Scheduling Renovation Coordination Q2. Please choose the BIM uses you would like to use on this project: Guide Continue Back Planning Design Construction Operations

57 Existing Conditions Modeling Programming Site Selection Preliminary Cost Estimation Phase Planning Site Analysis Constructability Review 3D Design Coordination Virtual Mock-ups Code Checking Engineering Analysis Emergency Evacuation Planning Security Validation Sustainability (LEED) Evaluation 3D Coordination Digital Fabrication 3D Control and Planning 3D System Design Unit Price Estimation 4D Planning Site Utilization Planning Record Model Asset Management Space Management/Tracking Disaster/Emergency Planning Building Performance Analysis Maintenance Cost Estimation Building Maintenance Scheduling Renovation Coordination Q2. Please choose the BIM uses you would like to use on this project: Guide Continue Back Planning Design Construction Operations

58 Existing Conditions Modeling Programming Site Selection Preliminary Cost Estimation Phase Planning Site Analysis Constructability Review 3D Design Coordination Virtual Mock-ups Code Checking Engineering Analysis Emergency Evacuation Planning Security Validation Sustainability (LEED) Evaluation 3D Coordination Digital Fabrication 3D Control and Planning 3D System Design Unit Price Estimation 4D Planning Site Utilization Planning Record Model Asset Management Space Management/Tracking Disaster/Emergency Planning Building Performance Analysis Maintenance Cost Estimation Building Maintenance Scheduling Renovation Coordination Q2. Please choose the BIM uses you would like to use on this project: Guide Continue Back Planning Design Construction Operations

59 Existing Conditions Modeling Programming Site Selection Preliminary Cost Estimation Phase Planning Site Analysis Constructability Review 3D Design Coordination Virtual Mock-ups Code Checking Engineering Analysis Emergency Evacuation Planning Security Validation Sustainability (LEED) Evaluation 3D Coordination Digital Fabrication 3D Control and Planning 3D System Design Unit Price Estimation 4D Planning Site Utilization Planning Record Model Asset Management Space Management/Tracking Disaster/Emergency Planning Building Performance Analysis Maintenance Cost Estimation Building Maintenance Scheduling Renovation Coordination Q2. Please choose the BIM uses you would like to use on this project: Guide Continue Back Planning Design Construction Operations

60 Existing Conditions Modeling Programming Site Selection Preliminary Cost Estimation Phase Planning Site Analysis Constructability Review 3D Design Coordination Virtual Mock-ups Code Checking Engineering Analysis Emergency Evacuation Planning Security Validation Sustainability (LEED) Evaluation 3D Coordination Digital Fabrication 3D Control and Planning 3D System Design Unit Price Estimation 4D Planning Site Utilization Planning Record Model Asset Management Space Management/Tracking Disaster/Emergency Planning Building Performance Analysis Maintenance Cost Estimation Building Maintenance Scheduling Renovation Coordination Q2. Please choose the BIM uses you would like to use on this project: Guide Continue Back Planning Design Construction Operations

61 Existing Conditions Modeling Programming Site Selection Preliminary Cost Estimation Phase Planning Site Analysis Constructability Review 3D Design Coordination Virtual Mock-ups Code Checking Engineering Analysis Emergency Evacuation Planning Security Validation Sustainability (LEED) Evaluation 3D Coordination Digital Fabrication 3D Control and Planning 3D System Design Unit Price Estimation 4D Planning Site Utilization Planning Record Model Asset Management Space Management/Tracking Disaster/Emergency Planning Building Performance Analysis Maintenance Cost Estimation Building Maintenance Scheduling Renovation Coordination Q2. Please choose the BIM uses you would like to use on this project: Guide Continue Back Planning Design Construction Operations

62 Existing Conditions Modeling Programming Site Selection Preliminary Cost Estimation Phase Planning Site Analysis Constructability Review 3D Design Coordination Virtual Mock-ups Code Checking Engineering Analysis Emergency Evacuation Planning Security Validation Sustainability (LEED) Evaluation 3D Coordination Digital Fabrication 3D Control and Planning 3D System Design Unit Price Estimation 4D Planning Site Utilization Planning Record Model Asset Management Space Management/Tracking Disaster/Emergency Planning Building Performance Analysis Maintenance Cost Estimation Building Maintenance Scheduling Renovation Coordination Q2. Please choose the BIM uses you would like to use on this project: Guide Continue Back Planning Design Construction Operations Continue

63 Programming 3D Design Coordination Sustainability (LEED) Evaluation 4D Planning Record Model Q2.1 Have you any experience with the following BIM uses? Guide Continue Back Specific BIM use definition can be access by clicking actual BIM use or clicking Guide. Yes No

64 Programming 3D Design Coordination Sustainability (LEED) Evaluation 4D Planning Record Model Q2.1 Have you any experience with the following BIM uses? Guide Continue Back Specific BIM use definition can be access by clicking actual BIM use or clicking Guide. Yes No

65 Programming 3D Design Coordination Sustainability (LEED) Evaluation 4D Planning Record Model Q2.1 Have you any experience with the following BIM uses? Guide Continue Back Specific BIM use definition can be access by clicking actual BIM use or clicking Guide. Yes No

66 Programming 3D Design Coordination Sustainability (LEED) Evaluation 4D Planning Record Model Q2.1 Have you any experience with the following BIM uses? Guide Continue Back Specific BIM use definition can be access by clicking actual BIM use or clicking Guide. Yes No

67 Programming 3D Design Coordination Sustainability (LEED) Evaluation 4D Planning Record Model Q2.1 Have you any experience with the following BIM uses? Guide Continue Back Specific BIM use definition can be access by clicking actual BIM use or clicking Guide. Yes No

68 Programming 3D Design Coordination Sustainability (LEED) Evaluation 4D Planning Record Model Q2.1 Have you any experience with the following BIM uses? Guide Continue Back Specific BIM use definition can be access by clicking actual BIM use or clicking Guide. Yes No

69 Programming 3D Design Coordination Sustainability (LEED) Evaluation 4D Planning Record Model Q2.1 Have you any experience with the following BIM uses? Guide Continue Back Specific BIM use definition can be access by clicking actual BIM use or clicking Guide. Yes No

70 Programming 3D Design Coordination Sustainability (LEED) Evaluation 4D Planning Record Model Q2.1 Have you any experience with the following BIM uses? Guide Continue Back Specific BIM use definition can be access by clicking actual BIM use or clicking Guide. Yes No

71 Programming 3D Design Coordination Sustainability (LEED) Evaluation 4D Planning Record Model Q2.1 Have you any experience with the following BIM uses? Guide Continue Back Specific BIM use definition can be access by clicking actual BIM use or clicking Guide. Yes No

72 Programming 3D Design Coordination Sustainability (LEED) Evaluation 4D Planning Record Model Q2.1 Have you any experience with the following BIM uses? Guide Continue Back Specific BIM use definition can be access by clicking actual BIM use or clicking Guide. Yes No Continue