Download presentation
Presentation is loading. Please wait.
1
AAE450 Spring 2009 Presentation Notes 1.Good Q&A Becoming ‘experts’ on your system! 2.Give background information / assumptions [Solomon Westerman] [PM]
2
AAE450 Spring 2009 Project Timeline 2/9/2008 TaskWeek 5Week 6Week 7Week 8Week 9 MWFMWFMWFMWFMWF PDR Complete Design Freeze (Mass/Power/Volume set) Draft Writing Evaluation of design alternatives (all phases) All design alternatives reach maturity and freeze Selection of final configurations Detailed analysis of X1, X2 Detailed analysis of final configurations
3
AAE450 Spring 2009 To-Do Today [Solomon Westerman] [PM] 1.Team Name Ideas Aura / Corona / Blue Moon (sponsorship?) T-shirts/Pins? 2.Presentations next week Order will be grouped based on relevance Email vehicle / plan on presentation to PM by Wed 3:00 PM Order will be given Thursday morning 1.Remember design requirements!!! Check PDR!!! Must be able to move up 45 degree solid slope! 90% communication until we land on Moon!
4
AAE450 Spring 2009 1.Break into the following groups (pick the one you are most focused in) TLI (Prop / Power / Strc /Ops ) Lunar Descent / Locomotion (Hopper) Locomotion (Toy Ball) Locomotion (Rover) Locomotion (Other) 2.Determine the following (15 minutes) – then short presentation, Q&A –Potential trouble spots with design –Sub-component largest potential for savings (M/P/V) –Work to be completed by Monday 8:00 PM
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.