EVLA Siting Logistics Sean Dougherty, HIA Chris Langley, NRAO 1DVA1 Meeting at NSFApril 15-16, 2010.

Similar presentations


Presentation on theme: "EVLA Siting Logistics Sean Dougherty, HIA Chris Langley, NRAO 1DVA1 Meeting at NSFApril 15-16, 2010."— Presentation transcript:

1 EVLA Siting Logistics Sean Dougherty, HIA Chris Langley, NRAO 1DVA1 Meeting at NSFApril 15-16, 2010

2 The following discussion will examine the site challenges associated with testing a 15 meter (or to a lesser extent, 12m). The EVLA site has been discussed as a strong candidate for these tests. Involvement of the NRAO in the DVA1 project is presently being negotiated. April 15-16, 2010DVA1 Meeting at NSF2

3 Siting Concerns Antenna Fabrication Building Antenna Pads / Interconnections Existing Key Subsystems Available Technical Support Safety Visitor-friendly Location DVA1 Meeting at NSF3April 15-16, 2010

4 Antenna Fabrication Building Dish cannot be manufactured in the open air – Dish mold (heavy) requires a concrete floor – Controlled air temperature required Safe mold storage temperature is 5 ⁰C to 35 ⁰C, with minimal fluctuation Resin infusion may occur between 15 ⁰C and 35 ⁰C – Clean environment required Space required to manufacture a 15m X 18m dish 1 – 55m L X 22m H X 10m ceiling apex, TBC – 19m L X 10m H opening – Fully outfitted Lights, floor, HVAC, ventilation, work and storage, … April 15-16, 2010DVA1 Meeting at NSF4 [1] R. Hellyer, “Composite Applications for Radio Telescopes (CART): Portable Factory for Fabrication of Composite Dishes,” NRC-CART Memo #0026, December 24, 2009.

5 Antenna Fabrication Building Cost to provide a suitable building could be significant (~ $500K) Existing EVLA structures – Do not fulfill basic requirements – Are unavailable due to EVLA construction schedule Is a building capable of housing full production necessary at this time? April 15-16, 2010DVA1 Meeting at NSF5 [1] R. Hellyer, “Composite Applications for Radio Telescopes (CART): Portable Factory for Fabrication of Composite Dishes,” NRC-CART Memo #0026, December 24, 2009.

6 Antenna Pads / Interconnections Seventy-two available EVLA pads – 12 Core SMF cable 2 ethernet, 2 LO, 1 Data Transmission, 7 spares – 208 Vac 3 Ø, 60 Hz, 160 A/Ø – Antenna may occupy different locations One available ALMA Test Facility pad – SM Corning Freedom 12 fibers – 208 Vac 3 phase, 60 Hz, 250 A/Ø & 400 Vac 3 Ø, 200 A/Ø – Does not allow for multiple DVA1 locations – Requires limited re-work DVA1 will require a metal frame adapter regardless of pad type April 15-16, 2010DVA1 Meeting at NSF6

7 EVLA Pad Fiber Interface Pad Box – houses 12 terminated fibers Each Antenna travels with its own umbilical cord. April 15-16, 2010DVA1 Meeting at NSF7

8 Existing Key Subsystems Slots are available in WIDAR correlator for data receiver cards. LO signals are available at all pads. Monitor and Control System may be expanded to accommodate DVA1. April 15-16, 2010DVA1 Meeting at NSF8

9 Available Support Machine shop Cryogenics group HVAC expertise Heavy lifting equipment & operators Additional local expertise April 15-16, 2010DVA1 Meeting at NSF9

10 Safety EVLA Safety Officer present on site Established safety procedures Safety equipment available April 15-16, 2010DVA1 Meeting at NSF10

11 Visitor-friendly Location NRAO Guest House along with ample hotel rooms in Socorro Restaurants and shopping in area Tourist venues in the immediate area Daily scheduled shuttles to/from the site April 15-16, 2010DVA1 Meeting at NSF11