Presentation is loading. Please wait.

Presentation is loading. Please wait.

RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.

Similar presentations


Presentation on theme: "RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date."— Presentation transcript:

1 RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date

2 RockSat-C 2012 SITR User Notes Please follow this template as closely as possible Although it seems short, most items will take multiple slides, and please include data and pictures because they are the best way to show off your awesome payloads!

3 RockSat-C 2012 SITR Mission Overview Brief, two liner, mission statement 3

4 RockSat-C 2012 SITR Mission Overview Give brief overview of test –Where, when, how long, how many times (if you’ve had multiple FMS accounting for previously discovered issues, please discuss in the upcoming slides) –Explain if anything wasn’t in flight configuration (not fully integrated in canister, some PCB missing, etc) and WHY 4

5 RockSat-C 2012 SITR Subsystem Overview You should be including, but are not limited to: Mechanical/Structure Electrical/ CDH Power (EPS) Software Science Please discuss the performance of each subsystem 5

6 RockSat-C 2012 SITR Mechanical/Structure Did the structure integrate as expected? Did you weigh the payload? Will you need ballast to reach the 20 +/- 0.2 requirement? For paired teams: What is the plan for integrating with your partner? –What will you use to connect to their payload? At what height? –What is your combined weight? –Where is your combined CG? What are the action items for structures between now and Launch Readiness Review? 6

7 RockSat-C 2012 SITR Electrical/CDH Did the electronics work? –Have they all been integrated with each other? –Did you test the activation system? Did it work? Did the electronics sample data? Have you retrieved the data? Does the data make sense? –Show graphs and plots! What are the action items for electronics between now and Launch Readiness Review? 7

8 RockSat-C 2012 SITR Power (EPS) How did the batteries perform? –Initial/final voltages? Any malfunctions with regulators or unexpected power draws? What are the action items for power between now and Launch Readiness Review? 8

9 RockSat-C 2012 SITR Software Did the software run correctly? Were the sampling rates those that were expected? What are the action items for software between now and Launch Readiness Review? 9

10 RockSat-C 2012 SITR Action Item Summary Show a detailed schedule here for when the action items for each subsystem will be designed, tested, and completed 10

11 RockSat-C 2012 SITR Pictures You don’t need to put all pictures here, this is just a note to please include as many payload pictures from the test and graphs of testing results as possible! 11

12 RockSat-C 2012 SITR Conclusions Issues and concerns? Closing remarks 12

13 RockSat-C 2012 SITR Appendix Extra/additional data plots Additional data not immediately relevant to presentation


Download ppt "RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date."

Similar presentations


Ads by Google