27 th October 2011 New Orleans, LA 27 th October 2011 New Orleans, LA Impact of Increased Modularization Grant Wattman.

Similar presentations


Presentation on theme: "27 th October 2011 New Orleans, LA 27 th October 2011 New Orleans, LA Impact of Increased Modularization Grant Wattman."— Presentation transcript:

1 27 th October 2011 New Orleans, LA 27 th October 2011 New Orleans, LA Impact of Increased Modularization Grant Wattman

2 PANELISTS Air Products & Chemicals Danny Fahringer, Strategic Sourcing Manager WorleyParsons James Cook, Logistics Manager Drexel Logistics Richard Knoll, President Mammoet USA Guus Stigter, Director of Sales

3 CONTEXT Independent unit that is a part of the total structure Consists of one or more systems forming a network for distributing something or forming a common purpose

4 SKIDS Typically one system

5 TRUCKABLE More than one system

6 VLM (Very Large Module) Multiple systems

7 CONSTRUCTION STRATEGY  Inclement Weather  Site craft labor posture  Security  Proximity to water  Location  Site density  Quality  Decreased construction time  Decreased commissioning time  Combining subject-matter experts with skilled labor

8 CONSTRUCTION STRATEGY CONT’D  Smaller footprint  Standardized design  Health and Safety  Economies of fabrication scale  Permitting  Schedule  Environmental  Plant layout optimization  Reduced site construction waste sustainability

9 CONSIDERATIONS  Modules are closed in and each module must integrate: Light Heat Ventilation Instrument air Emergency shutdown Main power Fire detection & suppression

10 CONSIDERATIONS CONT’D  Risk Profile  Site Layout  Discharge infrastructure  Organization culture (upfront planning)  Additional structure for transport