Presentation is loading. Please wait.

Presentation is loading. Please wait.

Common project problems From Twin Cities CFUG meeting7/10/02.

Similar presentations


Presentation on theme: "Common project problems From Twin Cities CFUG meeting7/10/02."— Presentation transcript:

1 Common project problems From Twin Cities CFUG meeting7/10/02

2 Problems 1 Communication – client and team Scope creep flexible structure to add features Someone else’s code (or my old code!) Bad code – logic flow, database issue, hard to read, bad variable and file name

3 Problems 2 Undocumented code Bad database design Lack of separation of design and code Lack of structures and common objects Change things in one place Lack reusability Lack of standards – every one else can’t maintain

4 Problems 3 Bugs found by client, hard to find Is it a bug or an enhancement Relying on memory or poor spec


Download ppt "Common project problems From Twin Cities CFUG meeting7/10/02."

Similar presentations


Ads by Google