Download presentation
Presentation is loading. Please wait.
Published byMaryann Townsend Modified over 9 years ago
1
LHC 14 & 15 April 2015 9:22: Ramp to 6.5 TeV lost due to MUFO, resulting in quench 10:30: Access during cryo recovery 16:00: Pre-cycle 17:05: RB.A78 short towards end of pre-cycle: access EPC 20:45: Cycling 22:00: Injection of beam. Beam dump system MKD waveform and abort gap keeper (AGK) set-up –23:45: QPS not OK for RB.A34, RQD/RQF.A34. Very likely communication problem with gateway 06:00: Pilots at 6.5 TeV 07:19: Dump again on BLM 15.R8 08:00: QPS – gateway problem is back, to be sorted out 15/04/2015LHC Morning meeting – MG & JU1
2
Third Multiple UFO @ B15R8, B2 15/04/2015LHC Morning meeting – MG & JU2 IP8 Q14Q15 Highest loss Quench After about 15 minutes at flat top, with 1 pilot per beam < 1e10 p+.
3
UFO Buster working again 15/04/2015LHC Morning meeting – MG & JU3 Also some B1 at 5R4…..
4
Actions taken Reduce BLM dump thresholds of 4 adjacent BLMs by factor of 2.2 –Dump the beam before the magnet quenches Installed two mobile BLMs on magnet C UFO buster is now working Post Mortem on orbit up again Contact with vacuum group; possibility of X-Ray of the interconnect 15/04/2015LHC Morning meeting – MG & JU4
5
Access done Vacuum BPM (fixed 9, another 9 to go, access needed, plus FESA restart) –Important for reference orbit we want to establish soon BLM (additional installation) BSRT Beam Presence flag: OK now Cryo IP7 door check Wire scanner AC dipole 15/04/2015LHC Morning meeting – MG & JU5
6
RB.A78 short Performed similar intervention also on RQD.A78 circuit Thanks to Mirko Pojer (OP), Consuelo Goncalves and Ivan Moya (EN/EL, they executed the work), Olivier Fournier and Charles Genton (TE/EPC, condemnation) To be followed up during TS1 15/04/2015LHC Morning meeting – MG & JU6 BeforeAfter
7
Beam Dump and timing MKD waveform measurement –BTV Sign change since last time… Abort Gap Keeper measurements –Need access to dial in the new delays on the beam dump 15/04/2015LHC Morning meeting – MG & JU7 ABT team
8
O-night One Ramp, MUFO on same BLM @ 6.5 TeV –Only one Mega UFO Laurette keeps smiling (dump 19 pilots at injection) 15/04/2015LHC Morning meeting – MG & JU8
9
Next With beam –MUFO research –Injection kicker MKI waveform IP8 –ADT and K-modulation other beam –RF blow-up in ramp (tbc) –Later: reference orbit at injection Without beam –ATLAS urgent access Thursday, 4 hours 15/04/2015LHC Morning meeting – MG & JU9
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.