THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
First deal of its kind in South Africa MARCH 2015 CONTACT: Sean Thomas, CEO +27 (0) +27 (0)
2
PROJECT SUMMARY Bio2Watt, is a Waste to Energy Project Development Company which owns, develops and builds the projects it is involved in. Bronkhorstspruit Biogas Project (Pty) Ltd (“BBP”) is a Renewable Energy IPP: 4.4MW installed electrical capacity and further 3MW available for greenhouse farming Electricity will be sold to BMW in Pretoria, roughly 60kms from the site. Total project costs amount to R150m, broken down as follows: R36m equity, R16m dti (SA govt) grant, R98m loan from the Industrial Development Corporation The project is structured as a limited recourse finance transaction. Equity investors include Norfund, the EPC contractor, two impact funds and Bio2Watt. Project will officially start evacuating power in April 2015
3
THE BRONKHORSTSPRUIT BIOGAS PROJECT
BENEFITS AVOID WATER POLLUTION BYPASS LANDFILLS AVOID GHG EMMISSIONS OFF-TAKER POWER PURCHASING AGREEMENT 3MW WASTE FLARE BIOGAS GAS ENGINES FERTILISER MIXER DIGESTOR FOOD PRODUCERS ORGANIC WASTE WASTE REDUCTION JOB CREATION MORE RENEWABLE ENERGY DEVELOPING LOCAL EXPERTISE
4
Anaerobic Digestion 2017/04/16 Confidential
5
SOME INTERESTING FACTOIDS
7 years From when project was started to Financial Closure March 2014 1,500 Pages of Legal documents – Typically agreements would lapse The Project Financial Model went through 56 iterations before being finalized: Frequently changing parameters & assumptions Cost increases demanding renegotiation of shareholder contributions Lender’s EPC Wrap and O&M Terms and Conditions were only tabled after quotes were accepted Many “last minute” changes to accommodate new risks We have produced over 1200 pages of legal agreements Total legal fees exceed R5m – some capitalised some not The project passed its Technical Due Diligence based on the wrong technology and incorrect assumptions. R8M … spent in legal fees
6
BBP – PROJECT TIMELINE Jan 2007 Jan 2008 Jan 2009 Jan 2010 Jan 2011
Aug 2012 Mar 2013 Feb 2014 Apr 2015 Pre-feasibility study Environmental Impact Assessment Supply Agreements PPA negotiations Connection and Wheeling Agreements Licenses & Permits Debt/Loan Agreement - IDC EPC Agreement O&M Agreement Equity Investors Construction
7
PROJECT TIMELINE Start 6 months 12 months 18 months 24 months
Pre-feasibility study Environmental Impact Assessment Supply Agreements PPA negotiations Connection and Wheeling Agreements Licenses & Permits Debt/Loan Agreement - IDC EPC Agreement Equity Investors Construction Operations
8
Challenges specific to SA
- Manure has to be at most 4 weeks old Mechanism to control stones from the manure Manure alone is not sufficient to make the plant viable Support from farm is critical e.g. grey water is required ±300m3/day At this stage Electricity price will be higher than municipality or Eskom The plant will require an off-taker that operates baseload Returns are low and drawn out - requires patient investors A very long list of licenses required 2017/04/16 Confidential
9
Licenses required for biogas project
LICENSES: - EIA - WULA - Waste License - Air Emission License - SALA MUNICIPALITIES: - Building Plan approval - By Laws - Consent of Use DOE, NERSA & ESKOM: - Generation License - Letter from DOE - Access to grid 2017/04/16 Confidential
10
Opportunities for large SA feedlots
Though the power is not sold to the feedlot owner it will be used in the vicinity of the plant – offering security of supply & possibility to access additional capacity which is valuable in current power constrained context Availability of a higher grade fertiliser both liquid and solid on site Access to a source of heat and carbon dioxide which could allow Farm to diversify Lease of land Better management of waste supported by Department of Environmental Affairs 2017/04/16 Confidential
11
How was this possible Farm: Buy-in & support from Farm is critical
Extensive amount of input required e.g. banks even request access to books to ensure Farm’s sustainability Funding Patient investors Development Finance Institution providing attractive loan Off-taker - Willing to pay a premium for Green Electricity
12
BRONKHORSTSPRUIT BIOGAS PROJECT
2017/04/16 Confidential