09.12.2014. Turin. ALTEC. ExoMars Progress Report ExoMars Science Working Team 09-12-2014
2
09.12.2014. Turin. ALTEC. ESA ESTRACK 2016 Mission Carrier Module (CM) Surface Platform NASA DSN Rover Descent Module (DM) 2 Schiaparelli EDL Demonstrator Module (EDM) MOCC @ ESOC Spacecraft Operations Science Operations Centre ESAC ROS Antennas ROCC Science Archive Back-up Centre IKI LPOCC Programme Overview Two missions launched in 2016 and 2018 The 2016 mission consists of a Trace Gas Orbiter (TGO) and an EDL Demonstrator Module (EDM) The 2018 mission consists of a Carrier Module (CM) and a Descent Module (DM) with a Rover and a stationary Landing Platform Trace Gas Orbiter (TGO) Proton M 2018 Mission. Proton M
3
09.12.2014. Turin. ALTEC. 3 Main Organisation Documents & Activity Document & activityStatus Cooperation AgreementSigned Joint Management PlanSigned 2018 mission Responsibility MatrixSigned in 2013 and 2014 (update) 2016 mission Responsibility MatrixSigned in 2014 Planning Agreement Signed in 2013 and 2014 (update) 2016 and 2018 missions Master SchedulesUnder revision Joint Configuration Control Management DocumentSigned ExoMars Joint Programme Objectives DocumentSigned Joint ExoMars Steering BoardFormed Chief Designers‘ BoardFormed Standards Review Working GroupFormed and operational Landing Site Selection Working GroupFormed and operational
4
09.12.2014. Turin. ALTEC. 4 TGO Science Instruments. ACS – Atmospheric Chemistry Suite. The three spectrometers cover respectively the bands 0.7–1.7 µm, 2.3–4.6 µm., and 1.7–17.0 µm. ACS will study trace gases, profile isotope ratios, and contribute to atmospheric escape studies. Status: ACS-STM delivered to TAS-F. Flight hardware is scheduled for delivery at the end of March 2015. FREND - Fine Resolution Epithermal Neutron Detector Neutron detector with a collimation module to significantly narrow the instrument’s field of view, thus allowing the creation of higher resolution maps of hydrogen distribution. Status: FREND-QM delivered to TAS-F. Flight hardware is scheduled for delivery at the end of February 2015.
5
09.12.2014. Turin. ALTEC. 5 Progress on the 2018 Mission MISSION & SYSTEM Joint DM Design Review 2018 DM DR Board Close-out took place on 13 October 2014 Several issues remained open however it was agreed to forward the open RIDs and issues to the S-PDR panels for disposition System PDR S-PDR Board session was held on November 6, 2014, with equal co-chairing of the European and the Russian participants After the session the conclusion was made that S-PDR objectives has not been fully achieved Final session of S-PDR Board is planned on May 5, 2015. March 2015 May 2015 April 2015 February 2015 December 2014 January 2014 Actions Closure Actions Acceptance #1 Actions Acceptance #2 2 Actions Acceptance #2 2 Responsibility Matrix Draft Close-Out Package Delivery Co-location Panel Endorsement S-PDR CO Board
6
09.12.2014. Turin. ALTEC. 6 Progress on the 2018 Mission DESCENT MODULE The DM baseline configuration is updated based on the DM DR outcome DM de-scoping re-distribution of functions of the Russian OBC-2 between the other Russian Units and European OBC-1 decrease of mass of the European RM decrease of mass of the Russian scientific equipment on Landing Platform Increase of clearance of landing platform Optimization of power supply/ power consumption system It is necessary to finalize PAS baseline configuration (number of stages, number of fixation points, loads at deployment etc.) CARRIER MODULE A Carrier Module Design Review (Industry Level Review) completed It is necessary to solve the issues on Power Supply System, thruster impact on DM, avoidance of collision with DM after separation
7
09.12.2014. Turin. ALTEC. Descent Module (DM) 2018 SCC Overview – Cruise Configuration Adapter with separation system Carrier Module (CM)
8
09.12.2014. Turin. ALTEC. 8 Parachute system Back Shield Rover 2018 DM Configuration Lander Front Shield
9
09.12.2014. Turin. ALTEC. 9 Rover Landed Platform with Rover – latest configuration Lander
10
09.12.2014. Turin. ALTEC. 10 MilestoneDate ESA Council at Min. Level2 December 2014. 2016 FM FREND and ACS deliveries to ESAFebruary – March 2015 2018 Mission CD/E1 Rider 2 signature1 April 2015 2018 Mission C/D Kick-OffTBD 2018 Mission S-PDR CO Board4 May 2015 2016 Mission SCC Adaptor and Separation Mechanism Test June 2015 2016 Mission EDM/TGO Mating for SCC Test11 June 2015 2016 Mission FARSeptember 2015 (TBC) 2016 Missions start Launch Campaign in Baikonur26 October 2015 Major Short Term Milestones