Offshore Developments
Topside Weight vs. Capacity and Total Installed Power Rev April 2015
2
Document Number : Rev Date Description DRL Engineering DRL Prepared
Checked Approved Review Date Approve Date 1 6 April 2015 Topside Weight vs.BOE JS 2 7 April 2015 Update after Fact Check 3 13 April 2015 Simplify and combine BOE and MW 4 19 April 2015 Additional Data 5 21 April 2015 Schedule added 6 23 April 2015 Project Weight Update Document Number :
3
PROCESS : OIL and GAS
4
HULL FORM
5
TOPSIDE WEIGHT vs. BOE by HULL FORM
Topside Weight is noticeably impacted by Hull Form Type It is recommended that Data Analysis is carried out by Hull Form
6
TOPSIDE WEIGHT vs. BOE by HULL FORM
Topside Weight (excl. Rig) vs. BOE Comparison by Hull Form. Based on a Daily Design Throughput of 150,000 BOE the “Benchmark” Topside Dry Weight for each concept is :- Multiple Deck FPSO 19,700 tonnes (131 kg/BOE) Fixed Structure 14,500 tonnes (97 kg/BOE) Conventional TLP 12,500 tonnes (83 kg/BOE) Semi Submersible 12,500 tonnes (83 kg/BOE) FPSO Conversion 10,500 tonnes (70 kg/BOE) Single Lift SPAR ,600 tonnes (64 kg/BOE)
7
TENSION LEG PLATFORM
8
TENSION LEG PLATFORM
9
SPAR
10
SEMI SUBMERSIBLE
11
NEW BUILD FPSO
12
FPSO CONVERSIONS
13
Single Deck New Build FPSO’s
FPSO Conversions and Single Deck New Build FPSO’s
14
FIXED STRUCTURES
15
BEST IN CLASS WEIGHT PERFORMANCE
New Build FPSO Skarv Bonga Angola 18 Girassol Dalia Schiehallion Balder Terra Nova Captain Norne FPSO Conversion Vincent Fife Espadarte Peregrino Curlew Bijipira & Salema Cidade de Anchieta Alvheim Conkauati Leadon Ettrick Abo Tension Leg Platforms Marco Polo Shenzi Prince Mars A SPAR Horn Mountain Neptune Nansen Boomvang Gulfstar Gunnision Perdido Semi Submersible Independence Hub Who Dat Delta House Na Kika Visund Njord Atlantis Thunder Horse Thunder Hawk Fixed Structures Guntong A North Cormorant Nelson Kepodang (Indonesia) Lay Tay (Vietnam) Erawan (Thailand) North Rankin B Draugen Troll C Petronious Eider Solan KBB Alen
16
Offshore Developments
Topside Weight vs. Total Installed Power in MW (PGTs + Process GTs)
17
PROCESS : OIL and GAS
18
HULL FORM
19
TENSION LEG PLATFORM
20
SPAR
21
SPAR
22
SEMI SUBMERSIBLE
23
NEW BUILD FPSO
24
FPSO CONVERSIONS
25
FIXED STRUCTURES : OIL
26
FIXED STRUCTURES : GAS
27
BEST IN CLASS WEIGHT PERFORMANCE
Tension Leg Platforms Mars A Brutus Magnolia Prince Marco Polo Shenzi SPAR Gulfstar Horn Mountain Neptune Medusa Perdido Mad Dog Semi Submersible Independence Hub Atlantis New Build FPSO Bonga Knarr Angola 18 Schiehallion Anasuria Triton Balder FPSO Conversion Abo Peregrino BC 10 Bijupira & Salema Fixed Structures Oil Guntong Kittiwake Eider Gas Bunga Raya A Jerneh Laggan
28
Some of the TOP Weight Performers
HORN MOUNTAIN SPAR INDEPENDENCE HUB SEMI SUBMERSIBLE MARCO POLO MINI TLP NEPTUNE SPAR MARS A CONVENTIONAL TLP SHENZI MINI TLP
29
Some of the NON Gulf of Mexico TOP Weight Performers
GUNTONG A (MALAYSIA) FIXED STRUCTURE NORTH CORMORANT (NORTH SEA) FIXED STRUCTURE MODULAR BUNGA RAYA A (MALAYSIA) FIXED STRUCTURE – INTEGRATED DECK NELSON (NORTH SEA) FIXED STRUCTURE INTEGRATED DECK
30
Some of the NON Gulf of Mexico TOP Weight Performers
BONGA (NIGERIA) MULTIPLE DECK FPSO PEREGRINO (BRAZIL) FPSO CONVERSION ANASURIA (NORTH SEA) SINGLE DECK FPSO SCHIEHALLION (West of Shetland) SINGLE DECK FPSO
31
Execution Duration vs. Topside Weight