1 Offshore Developments
Topside Weight vs. Capacity and Total Installed Power Rev April 2015

2 Document Number : Rev Date Description DRL Engineering DRL Prepared
Checked Approved Review Date Approve Date 1 6 April 2015 Topside Weight vs.BOE JS 2 7 April 2015 Update after Fact Check 3 13 April 2015 Simplify and combine BOE and MW 4 19 April 2015 Additional Data 5 21 April 2015 Schedule added 6 23 April 2015 Project Weight Update Document Number :

3 PROCESS : OIL and GAS

4 HULL FORM

5 TOPSIDE WEIGHT vs. BOE by HULL FORM
Topside Weight is noticeably impacted by Hull Form Type It is recommended that Data Analysis is carried out by Hull Form

6 TOPSIDE WEIGHT vs. BOE by HULL FORM
Topside Weight (excl. Rig) vs. BOE Comparison by Hull Form. Based on a Daily Design Throughput of 150,000 BOE the “Benchmark” Topside Dry Weight for each concept is :- Multiple Deck FPSO 19,700 tonnes (131 kg/BOE) Fixed Structure 14,500 tonnes (97 kg/BOE) Conventional TLP 12,500 tonnes (83 kg/BOE) Semi Submersible 12,500 tonnes (83 kg/BOE) FPSO Conversion 10,500 tonnes (70 kg/BOE) Single Lift SPAR ,600 tonnes (64 kg/BOE)

7 TENSION LEG PLATFORM

8 TENSION LEG PLATFORM

9 SPAR

10 SEMI SUBMERSIBLE

11 NEW BUILD FPSO

12 FPSO CONVERSIONS

13 Single Deck New Build FPSO’s
FPSO Conversions and Single Deck New Build FPSO’s

14 FIXED STRUCTURES

15 BEST IN CLASS WEIGHT PERFORMANCE
New Build FPSO Skarv Bonga Angola 18 Girassol Dalia Schiehallion Balder Terra Nova Captain Norne FPSO Conversion Vincent Fife Espadarte Peregrino Curlew Bijipira & Salema Cidade de Anchieta Alvheim Conkauati Leadon Ettrick Abo Tension Leg Platforms Marco Polo Shenzi Prince Mars A SPAR Horn Mountain Neptune Nansen Boomvang Gulfstar Gunnision Perdido Semi Submersible Independence Hub Who Dat Delta House Na Kika Visund Njord Atlantis Thunder Horse Thunder Hawk Fixed Structures Guntong A North Cormorant Nelson Kepodang (Indonesia) Lay Tay (Vietnam) Erawan (Thailand) North Rankin B Draugen Troll C Petronious Eider Solan KBB Alen

16 Offshore Developments
Topside Weight vs. Total Installed Power in MW (PGTs + Process GTs)

17 PROCESS : OIL and GAS

18 HULL FORM

19 TENSION LEG PLATFORM

20 SPAR

21 SPAR

22 SEMI SUBMERSIBLE

23 NEW BUILD FPSO

24 FPSO CONVERSIONS

25 FIXED STRUCTURES : OIL

26 FIXED STRUCTURES : GAS

27 BEST IN CLASS WEIGHT PERFORMANCE
Tension Leg Platforms Mars A Brutus Magnolia Prince Marco Polo Shenzi SPAR Gulfstar Horn Mountain Neptune Medusa Perdido Mad Dog Semi Submersible Independence Hub Atlantis New Build FPSO Bonga Knarr Angola 18 Schiehallion Anasuria Triton Balder FPSO Conversion Abo Peregrino BC 10 Bijupira & Salema Fixed Structures Oil Guntong Kittiwake Eider Gas Bunga Raya A Jerneh Laggan

28 Some of the TOP Weight Performers
HORN MOUNTAIN SPAR INDEPENDENCE HUB SEMI SUBMERSIBLE MARCO POLO MINI TLP NEPTUNE SPAR MARS A CONVENTIONAL TLP SHENZI MINI TLP

29 Some of the NON Gulf of Mexico TOP Weight Performers
GUNTONG A (MALAYSIA) FIXED STRUCTURE NORTH CORMORANT (NORTH SEA) FIXED STRUCTURE MODULAR BUNGA RAYA A (MALAYSIA) FIXED STRUCTURE – INTEGRATED DECK NELSON (NORTH SEA) FIXED STRUCTURE INTEGRATED DECK

30 Some of the NON Gulf of Mexico TOP Weight Performers
BONGA (NIGERIA) MULTIPLE DECK FPSO PEREGRINO (BRAZIL) FPSO CONVERSION ANASURIA (NORTH SEA) SINGLE DECK FPSO SCHIEHALLION (West of Shetland) SINGLE DECK FPSO

31 Execution Duration vs. Topside Weight