1 Gas Well Deliquification Breakout Session
Ask Experts about Troubleshooting Plunger Lift Wells Lynn Rowlan, Echometer Company Dave Cosby, Shale Tec LLC Dave Green, Well Master Stan Lusk, Patriot Artificial Lift Jack Rogers, Patriot Artificial Lift Title slide Keep the title brief and to one line? The second line (in smaller type style) is for the date of the presentation – depending on your presentation, you may also need to include Location and/or Presenter’s name/s and Job title if needed – as a such a second line may be used for these purposes. Do not include unnecessary information in your presentation title – starting off with clear and simple messages will set the style and focus the audience for what is to follow.

2 Breakout Session Details Duration of Session – Full Time Allotted
Session Purpose: Experts = Instructors from Plunger Lift Class 102 Our Goal was to facilitate discussion. Number of Attendees 15 LEASE OPERATORS 30 ENGINEERS, 15 PRODUCTION FOREMAN  EXPERIENCE: 15 – LESS THAN 1 YEAR & 15 – 1-5 YEARS 25 > 5 YEARS & > 10 YEARS February 24, 2015 2014 Gas Well Workshop

3 Discussion Points WHEN DOES PLUNGER GET TO BOTTOM?
TO GUARANTEE PLUNGER REACHED BOTTOM, DOES WELL NEED EXTRA SHUT-IN?   PROBABLY OK TO HAVE EXTRA 10%  NEED TO TRACK PLUNGER AND DETERMINE IF PLUNGER IS REACHING BOTTOM  WHEN DO YOU USE MULTI-STAGE APPLICATION MININMUM ON WELL IF PLUNGER IS STRUGGLING, WON’T RUN SMALL CASING, LOW GLR February 24, 2015 2015 Gas Well Workshop

4 Discussion Points Can Surfactant Help Plunger Lift
MAY NOT HELP – HAS IN SOME CASES HELPED GASSY COLUMN TALLER / REQUIRES MORE SHUT-IN TIME TO FALL THROUGH HELPS BELOW EOT OR LOW PRESSURE WELLS OPERATORS ARE USING SURFACTANTS w/ PLUNGERS WHERE TO SET HORIZONTAL BUMPER SPRING 45 – 60 DEGREES MAX. DEVIATION – OR DEERER SET HIGH MAY NEED STANDING VALVE NEED PLUNGER THAT MAINTAINS SEAL LIMITED BY WIRELINE RETREVAL DEPTH February 24, 2015 2015 Gas Well Workshop

5 Discussion Points MY WELL HAS TUBING PSI > CASING PRESSURE
HOLE IN TUBING SEVERE LOADING TUBING SET TOO DEEP OTHER?? DO YOU SET PRODUCTION GOALS YES, USE ENTIRE DECLINE CURVE RESERVOIR ENGINEER TEAM ALSO SETS/ADJUST GOALS APPROVED BY PUMPER February 23, 2015 2015 Gas Well Workshop

6 Discussion Points NO. OF WELLS PER PUMPER
90/MAN MORE MANUAL INTERVENTION 160/MAN WITH AUTOMATION COMPACT AREA What is Wrong with my well TUBING PSI DROPS TO 10 FROM 1000. CASING PRESSURE DOES NOT CHANGE. BLOCKAGE IN CASING ABOVE EOT TRY A FRESH WATER FLUSH BEWARE HIGH ENERGY STORED IN CASING PLUNGER MAY COME UP TOO FAST February 24, 2015 2015 Gas Well Workshop

7 More topics discussed than time permits – not everything recorded
Summary More topics discussed than time permits – not everything recorded Lot of interest YES –This Session Should Be Repeated in the Future February 24, 2015 2015 Gas Well Workshop

8 Copyright Rights to this presentation are owned by the company(ies) and/or author(s) listed on the title page. By submitting this presentation to the Gas Well Deliquification Workshop, they grant to the Workshop, the Artificial Lift Research and Development Council (ALRDC), and the Southwestern Petroleum Short Course (SWPSC), rights to: Display the presentation at the Workshop. Place it on the web site, with access to the site to be as directed by the Workshop Steering Committee. Place it on a CD for distribution and/or sale as directed by the Workshop Steering Committee. Other uses of this presentation are prohibited without the expressed written permission of the company(ies) and/or author(s) who own it and the Workshop Steering Committee. February 24, 2015 2015 Gas Well Workshop

9 Disclaimer The following disclaimer shall be included as the last page of a Technical Presentation or Continuing Education Course. A similar disclaimer is included on the front page of the Gas Well Deliquification Web Site. The Artificial Lift Research and Development Council and its officers and trustees, and the Gas Well Deliquification Workshop Steering Committee members, and their supporting organizations and companies (here-in-after referred to as the Sponsoring Organizations), and the author(s) of this Technical Presentation or Continuing Education Training Course and their company(ies), provide this presentation and/or training material at the Gas Well Deliquification Workshop "as is" without any warranty of any kind, express or implied, as to the accuracy of the information or the products or services referred to by any presenter (in so far as such warranties may be excluded under any relevant law) and these members and their companies will not be liable for unlawful actions and any losses or damage that may result from use of any presentation as a consequence of any inaccuracies in, or any omission from, the information which therein may be contained. The views, opinions, and conclusions expressed in these presentations and/or training materials are those of the author and not necessarily those of the Sponsoring Organizations. The author is solely responsible for the content of the materials. The Sponsoring Organizations cannot and do not warrant the accuracy of these documents beyond the source documents, although we do make every attempt to work from authoritative sources. The Sponsoring Organizations provide these presentations and/or training materials as a service. The Sponsoring Organizations make no representations or warranties, express or implied, with respect to the presentations and/or training materials, or any part thereof, including any warrantees of title, non-infringement of copyright or patent rights of others, merchantability, or fitness or suitability for any purpose. February 24, 2015 2015 Gas Well Workshop


Download ppt "Gas Well Deliquification Breakout Session"

Similar presentations


Ads by Google