Download presentation
Presentation is loading. Please wait.
Published byMargery Richardson Modified over 9 years ago
1
Scaling Up and Spreading Change Jane Taylor, Ed.D. Improvement Advisor to SCCM
2
2 Scale Up and Spread Implementation – Making change permanent on a pilot site or units Scale Up – Overcoming systemic barriers that emerge while implementing – Overcoming infra-structure issues that would inhibit implementation and spread Spread – Replication of change(s) with other people and other sites
3
3 Examples from Sepsis Screening and Response Implementation – Screening of every patient every shift – Requires incorporation in flow – Simulation of response – Role clarity – Job description changes – Training and new hire orientation – Policy and procedure – Standardization and specification – Documentation – Protocols and nurse driven protocols
4
4 Scale up Infra-structure issues – No place to document screening for data capture and communication Systemic barriers
5
5 Spread Moving across from pilot unit to all medical surgical units Moving to hospitals within the healthcare system
6
6 Thank You
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.