DIABLO CANYON SPENT FUEL STORAGE: SELECTED ISSUES

Similar presentations


Presentation on theme: "DIABLO CANYON SPENT FUEL STORAGE: SELECTED ISSUES"— Presentation transcript:

1 DIABLO CANYON SPENT FUEL STORAGE: SELECTED ISSUES
CEC 2015 Joint Commissioner Workshop April 27, 2015 Peter Lam, Ph.D. Administrative Judge Emeritus

2 DIABLO CANYON SPENT FUEL STORAGE: SELECTED ISSUES
Still Waiting for Federal Central Depository NRC Waste Confidence Rule Safety of Spent Fuel Pool Safety of Dry Cask Storage CEC IEPR Recommendations Independent Safety Committee Inquiries

3 NRC WASTE CONFIDENCE RULE
1979 Ruling from U. S. Court of Appeals for the D. C. Circuit 1984 Waste Confidence Rule Codified in 10 CFR 51.23 Rule Updated 1990, and 2010 2012 D. C. Circuit Court Decision Elaborate Plan for Additional Actions

4 SAFETY OF SPENT FUEL POOL
Lack of Containment Very Large Fission Products Inventory Active Cooling High Density Rack Configuration Zr-Cladding Fire Scenarios Large Water Inventory

5 SAFETY OF DRY CASK STORAGE
NRC Certified Dry Casks Relatively Small Fission Products Inventory Relatively Robust Structures Passive Cooling Location in an Open Environment

6 CEC IEPR RECOMMENDATIONS
2008 IEPR Recommended that PG&E “Return the Spent Fuel Pools to Open Racking Arrangements as Soon as Feasible” 2011 IEPR Stated “An Option---Is to Expedite the Transfer of the Older Spent Fuel from Pools into Dry Storage Casks”

7 INDEPENDENT SAFETY COMMITTEE INQUIRIES
Numerous On-Site Fact Finding Meetings on High Density and Open Racking Arrangements; on Expediting Spent Fuel Transfer into Dry Casks: and Other Pool Safety Issues Many PG&E Presentations at Committee’s Public Meetings Formal Committee Recommendations in the 21st and 23rd Annual Reports

8 EXPEDITIZING DRY CASK STORAGE: POLICY & TECHNICAL CONSTRAINTS
Federal Rule on Spent Fuel Configuration Waiting Time in the Pool Before Transfer Thermal Limits of The Dry Cask Pad Construction Schedule Cask Availability Plant Staff Availability