Download presentation
Presentation is loading. Please wait.
Published byEdgar Jenkins Modified over 9 years ago
1
Aberdeen-Stavanger Gateway
2
DOF Subsea 2 Welcome Giovanni Corbetta, Managing Director DOF Subsea, part of the DOF Group
3
DOF Subsea 3
4
4 “To be a world class integrated offshore company, delivering marine services and subsea solutions responsibly, without risk, together, every day”
5
5 Steady business Time charter/ROV contracts Long-term contracts DOF Subsea DOF Subsea business model
6
Company Capabilities Integrated Subsea Construction Engineering Flexible & Umbilical Installation Subsea Structure Installation Mooring & Riser Installation Inspection Maintenance & Repair Tie-in & Diverless Intervention Capabilities Field Abandonment & Decommissioning Seabed Mapping Positioning Services DOF Subsea
7
DOF Subsea Atlantic fleet DOF Subsea 7 Skandi SkoltenSkandi Skansen Normand Reach Geosund Skandi Inspector Geoholm
8
DOF Subsea in Aberdeen Moved into Aberdeen in 2006 Opportunities in subsea / marine construction Success to date Followed by a trend of vessel owners moving towards a more projects-based approach DOF Subsea 8
9
Aberdeen – Norway Working together as a region 350 staff working in Atlantic operations People synergies Skills transfer and maximising knowledge Lessons learned DOF Subsea 9
10
Challenges Cultural differences -office culture -business relationships Communication -language barriers -physical distance DOF Subsea 10
11
DOF Subsea Focus regions Global Locations
12
Current projects DOF Subsea
13
Gina Krog FSO Field Development Scope: Installation of TM Buoy Installation of Riser and Riser Base Design, Fabrication and Installation of Spool and Covers Offshore installation May and June 2016 Vessels: Skandi Skolten Normand Reach DOF Subsea 13
14
Maersk Riser Replacement, North Sea Scope: Removal of existing flexible riser system on the Dunbarton field Installation of new riser system Associated surveys Offshore installation will commence July 2014 Vessel: Normand Reach DOF Subsea 14
15
Shell – Corrib Natural Gass Field, Ireland Scope: Disconnecting of the redundant flexible flowlines Install two flexible flowlines Tie-ins of the new flowlines to the wellhead and subsea manifold using the GE Icarus tie- in tool Offshore Installation August 2014 Vessel: Normand Reach DOF Subsea 15
16
Thank you!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.