Presentation is loading. Please wait.

Presentation is loading. Please wait.

PLM-TEAMCENTER GATLA SAI RAM 206731 1. INRODUCTION HISTORY COMPONENTS AND PRODUCTS DATA MANAGEMENT IN TEAMCENTER - EXPORTS AND IMPORTS -MIGRATION -FACTORS.

Similar presentations


Presentation on theme: "PLM-TEAMCENTER GATLA SAI RAM 206731 1. INRODUCTION HISTORY COMPONENTS AND PRODUCTS DATA MANAGEMENT IN TEAMCENTER - EXPORTS AND IMPORTS -MIGRATION -FACTORS."— Presentation transcript:

1 PLM-TEAMCENTER GATLA SAI RAM 206731 1

2 INRODUCTION HISTORY COMPONENTS AND PRODUCTS DATA MANAGEMENT IN TEAMCENTER - EXPORTS AND IMPORTS -MIGRATION -FACTORS -DESIGN OF APPROACH -REPORT BILL OF MATERIAL CUSTOMIZATION ADVANTAGES CONCLUSION 2

3 INTRODUCTION 3

4 TEAMCENTER History Siemens PLM system(UGS PLM System) In mid 1980’s with technology and products from CDC, SDRC and UGS. Teamcenter Enterprise & Teamcenter Engineering Its robust architecture is integrated with Microsoft windows 4

5 COMPONENTS AND ITS PRODUCTS Community CollaborationTeamcenter Community Compliance ManagementTeamcenter for Compliance Management Engineering Process ManagementTeamcenter Engineering Enterprise Knowledge ManagementTeamcenter Enterprise Maintenance, Repair and OverhaulTeamcenter for MRO Manufacturing Process ManagementTeamcenter Manufacturing Program and Project ManagementTeamcenter Project Systems EngineeringTeamcenter for Systems Engineering & Requirements Sourcing ManagementTeamcenter Sourcing Lifecycle VisualizationTeamcenter Visualization Reporting and AnalyticsTeamcenter for Reporting & Analytic Simulation Process ManagementTeamcenter for Simulation 5

6 Data Management in Teamcenter 6

7 Export & Import PLM XML Powerful tool Flexible in defining rules Contains admin module Transfer Mode  Closure rule  Property rule  Filter rule 7

8 TRANSFER MODE 8

9 MIGRATION Aspects of data migration Meta data Document file CAD data System migration  Single system  Multiple system a)multiple to single system b)multiple system to multiple system Preprocess migration 9 What dataanalysismapping

10 Analysis New system Old system Business process Gap analysis –finds the functionality difference Mapping One to one mapping, Ex- One to many mapping Many to one mapping Property mapping 10 Old system [property] New system [business object]

11 FACTORS OF MIGRATION Migration Bulk Phase 11

12 Bulk  Data migration at once  All users switch over  All the process move to new  Source system remain unaltered Phase Group wise, project wise, workflow based etc. Set of users switch over the time. Co-existence of old and new system for some duration (From months to a year or so) 12

13 DESIGN APPROACH 13

14 CAD migration Is done through third party migration tool (UG NX tool like ug_export/ug_import and ug_clone) 14

15 Report in Teamcenter Contain report builder module Reports are based on query and PLMXML frame work a)Get the object through query b)Convert to xml output c)Xsl style sheet is applied for layout 15 Query Closure rule Property Report format Style sheet

16 BILL OF MATERIAL 16

17 CUSTOMIZATION 17

18 CAD DATA CUSTOMIZING 18

19 ADVANTAGE Secure Fast Simple customizing Reliable Reduce translation cost 19

20 CONCLUSION Enables the team to actively participate Long term business result Smart decisions Better product Success Source Manoj Tiwari http://teamcenterplm.blogspot.de/ http://en.wikipedia.org/wiki/Teamcenter 20

21 THANK YOU 21


Download ppt "PLM-TEAMCENTER GATLA SAI RAM 206731 1. INRODUCTION HISTORY COMPONENTS AND PRODUCTS DATA MANAGEMENT IN TEAMCENTER - EXPORTS AND IMPORTS -MIGRATION -FACTORS."

Similar presentations


Ads by Google