Download presentation
Presentation is loading. Please wait.
1
Status of N2-WP3 Claudia Tomei - LNGS
2
Annual Report Public Communication Tasks - 5th full working meeting lab visit no. 5 (Pyhasalmi) - translation of lab booklet started - update of posters - start of film (conditional) -first edit of existing Spanish film as joint labs film - -review all professional films from the labs - -agree on video conference format and technical details - -translation of booklets into other languages - 6th full meeting - lab visit no. 6 -improved joint labs booklet introduction -new material for the web page -first use of web cast for schools between two labs Milestones And Deliverables - 3rd joint open day (NB: tasks and milestones for common management now in WP1) -first joint web-cast of labs at LNGS open day -draft update of joint labs information pack in English -Distribution of films (English versions) -draft update of joint outreach web pages -4th joint open day -draft report on strengths and weaknesses of lab outreach activities Even though at the LNGS Open Day 2006 several copies of the Canfranc movie on DM were distributed to public 25 th to 30 th Month 31 st to 36 th Month37 th to 42 th Month Critical Points: movie translation of booklet
3
LNGS Open Day 2006 ILIAS stand First attempt of internet connection to lab web-cams PC showing lab movies
4
LNGS Open Day 2006 ILIAS stand well organized: Always keep posters updated Improve connection to the public (web-cams, movies) The connection to lab web-cams worked for LSM and Boulby but the way it was performed did not captured the interest of general public (not well advertised) REPORT AVAILABLE
5
Other initiatives Visit to Pyhäsalmy Progress on the joint brochure: prototype ready from LNGS prototype ready from LNGS Comments / suggestions are welcome !! We need pictures, pictures, pictures !!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.