Systems Design: Job-Order costing Chapter 3
2
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Types of Costing Systems Used to Determine Product Costs Process Costing Job-order Costing Many different products are produced each period. Products are manufactured to order. Cost are traced or allocated to jobs. Cost records must be maintained for each distinct product or job. Chapter 4
3
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Types of Costing Systems Used to Determine Product Costs Process Costing Job-order Costing Typical job order cost applications: Special-order printing Building construction Also used in the service industry Hospitals Law firms
4
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Costing THE JOB Direct material Direct labor Traced directly to each job Manufacturing overhead (OH) Applied to each job using a predetermined rate
5
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Manufacturing Overhead Job No. 1 Job No. 2 Job No. 3 Charge direct material and direct labor costs to each job as work is performed. Sequence of Events in a Job-Order Costing System Direct Materials Direct Labor
6
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Apply overhead to each job using a predeter- mined rate. Sequence of Events in a Job-Order Costing System Direct Materials Direct Labor Job No. 1 Job No. 2 Job No. 3 Manufacturing Overhead
7
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Cost Accounting The primary document for tracking the costs associated with a given job is the job cost sheet. Let’s investigate
8
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Cost Accounting
9
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Cost Accounting
10
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Materials Requisition Form Will E. Delite
11
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Materials Requisition Form Will E. Delite Type, quantity, and total cost of material charged to job A-143. Cost of material is charged to job A-143.
12
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Cost Accounting
13
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Costing Document Flow Summary Job Cost Sheets Materials Requisition Direct material s Indirect materials Manufacturing Overhead Account Materials used may be either direct or indirect.
14
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Cost Accounting Workers use time tickets to record the time spent on each job. Let’s see one
15
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Employee Time Ticket
16
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Cost Accounting
17
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Costing Document Flow Summary Job Cost Sheets Employee Time Ticket Manufacturing Overhead Account Direct Labor Indirect Labor An employee’s time may be either direct or indirect.
18
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Cost Accounting Apply manufacturing overhead to jobs using a predetermined overhead rate of $4 per direct labor hour (DLH). Let’s do it
19
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Cost Accounting
20
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Estimated total manufacturing overhead cost for the coming period Estimated total units in the allocation base for the coming period POHR = The predetermined overhead rate (POHR) used to apply overhead to jobs is determined before the period begins. Application of Manufacturing Overhead Ideally, the allocation base is a cost driver that causes overhead.
21
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Application of Manufacturing Overhead Overhead applied = POHR × Actual activity Actual amount of the cost driver such as units produced, direct labor hours, or machine hours. Incurred during the period. Based on estimates, and determined before the period begins.
22
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Application of Manufacturing Overhead Recall the wooden crate example where: Overhead applied = $4 per DLH × 8 DLH = $32 Overhead applied = POHR × Actual activity
23
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order Costing Document Flow Summary Employee Time Ticket Job Cost Sheets Materials Requisition Other Actual OH Charges Indirect Material Indirect Labor Applied Overhead Manufacturing Overhead Account
24
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill The Need for a Predetermined Manufacturing Overhead Rate Using a predetermined rate makes it possible to estimate total job costs sooner. Actual overhead for the period is not known until the end of the period. $
25
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill PearCo applies overhead based on direct labor hours. Total estimated overhead for the year is $640,000. Total estimated labor cost is $1,400,000 and total estimated labor hours are 160,000. What is PearCo’s predetermined overhead rate per hour? Overhead Application Example
26
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill For each direct labor hour worked on a job, $4.00 of factory overhead will be applied to the job. Overhead Application Example POHR = $4.00 per DLH $640,000 160,000 direct labor hours (DLH) POHR = Estimated total manufacturing overhead cost for the coming period Estimated total units in the allocation base for the coming period POHR =
27
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Overhead Application Example What amount of overhead will PearCo apply to Job X-32?
28
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Overhead Application Example
29
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Let’s examine the cost flows in a job-order costing system. We will use T-accounts and start with materials. Job-Order System Cost Flows
30
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Raw Materials Material Purchases Direct Materials Mfg. Overhead Indirect Materials Job-Order System Cost Flows Work in Process (Job Cost Sheet) Indirect Materials ActualApplied
31
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Next let’s add labor costs and applied manufacturing overhead to the job-order cost flows. Are you with me? Job-Order System Cost Flows
32
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Job-Order System Cost Flows Direct Labor Mfg. Overhead Salaries and Wages Payable Work in Process (Job Cost Sheet) Direct Materials Overhead Applied to Work in Process Indirect Labor Others Direct Labor Overhead Applied Indirect Labor Indirect Materials ActualApplied If actual and applied manufacturing overhead are not equal, a year-end adjustment is required.
33
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Now let’s complete the goods and sell them. Still with me? Job-Order System Cost Flows
34
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Cost of Goods Mfd. Finished Goods Cost of Goods Sold Cost of Goods Mfd. Cost of Goods Sold Job-Order System Cost Flows Work in Process (Job Cost Sheet) Direct Materials Direct Labor Overhead Applied
35
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Let’s return to PearCo and see what we will do if actual and applied overhead are not equal. Job-Order System Cost Flows
36
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Overhead Application Example PearCo’s actual overhead for the year was $650,000 for a total of 170,000 direct labor hours. How much total overhead was applied to PearCo’s jobs during the year? Use PearCo’s predetermined overhead rate of $4.00 per direct labor hour.
37
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Overhead Application Example SOLUTION Applied Overhead = POHR × Actual Direct Labor Hours Applied Overhead = $4.00 per DLH × 170,000 DLH = $680,000 PearCo’s actual overhead for the year was $650,000 for a total of 170,000 direct labor hours. How much total overhead was applied to PearCo’s jobs during the year? Use PearCo’s predetermined overhead rate of $4.00 per direct labor hour.
38
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill SOLUTION Applied Overhead = POHR × Actual Direct Labor Hours Applied Overhead = $4.00 per DLH × 170,000 DLH = $680,000 PearCo’s actual overhead for the year was $650,000 for a total of 170,000 direct labor hours. How much total overhead was applied to PearCo’s jobs during the year? Use PearCo’s predetermined overhead rate of $4.00 per direct labor hour, Overhead Application Example PearCo has overapplied overhead for the year by $30,000. What will PearCo do?
39
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Work in Process Finished Goods Cost of Goods Sold $30,000 may be allocated to these accounts. $30,000 may be closed directly to cost of goods sold. Cost of Goods Sold Overapplied and Underapplied Manufacturing Overhead PearCo’s Method OR
40
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Overapplied and Underapplied Manufacturing Overhead PearCo’s Mfg. Overhead Actual overhead costs $650,000 $30,000 overapplied PearCo’s Cost of Goods Sold Unadjusted Balance $30,000 Adjusted Balance Overhead Applied to jobs $680,000
41
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Overapplied and Underapplied Manufacturing Overhead - Summary PearCo’s Method
42
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Tiger, Inc. had actual manufacturing overhead costs of $1,210,000 and a predetermined overhead rate of $4.00 per machine hour. Tiger, Inc. worked 290,000 machine hours during the period. Tiger’s manufacturing overhead is a. $50,000 overapplied. b. $50,000 underapplied. c. $60,000 overapplied. d. $60,000 underapplied. Tiger, Inc. had actual manufacturing overhead costs of $1,210,000 and a predetermined overhead rate of $4.00 per machine hour. Tiger, Inc. worked 290,000 machine hours during the period. Tiger’s manufacturing overhead is a. $50,000 overapplied. b. $50,000 underapplied. c. $60,000 overapplied. d. $60,000 underapplied. Overhead Application Question 1
43
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Assume that Tiger’s overhead was $60,000 underapplied. This amount would result in an adjustment that would decrease cost of goods sold by $60,000. a. True b. False Assume that Tiger’s overhead was $60,000 underapplied. This amount would result in an adjustment that would decrease cost of goods sold by $60,000. a. True b. False Overhead Application Question 2
44
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Let’s look at summary journal entries for a job- order costing system. We’ll omit the numbers so that we can focus on accounts. Job-Order Costing – Typical Accounting Entries
45
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Cost Flows – Material Purchases Raw material purchases are recorded in an inventory account.
46
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Direct materials issued to a job increase Work in Process and decrease Raw Materials. Indirect materials used are charged to Manufacturing Overhead and also decrease Raw Materials. Cost Flows – Material Usage
47
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Cost Flows – Labor The cost of direct labor incurred increases Work in Process and the cost of indirect labor increases Manufacturing Overhead.
48
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Cost Flows – Actual Overhead In addition to indirect materials and indirect labor, other manufacturing overhead costs are charged to the Manufacturing Overhead account as they are incurred.
49
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Cost Flows – Overhead Applied Work in Process is increased when Manufacturing Overhead is applied to jobs.
50
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Cost Flows – Period Expenses Nonmanufacturing costs (period expenses) are charged to expense as they are incurred.
51
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Cost Flows – Cost of Goods Manufactured As jobs are completed, the cost of goods manufactured is transferred to Finished Goods from Work in Process.
52
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Cost Flows – Sales When finished goods are sold, two entries are required: (1) to record the sale; and (2) to record Cost of Goods Sold and reduce Finished Goods.
53
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill End of Chapter 3