Presentation is loading. Please wait.

Presentation is loading. Please wait.

Lec 18, Ch.9, pp. 359-375 : Basic freeway segment LOS (objectives) Be able to conduct operational and planning analyses of the capacity analysis of basic.

Similar presentations


Presentation on theme: "Lec 18, Ch.9, pp. 359-375 : Basic freeway segment LOS (objectives) Be able to conduct operational and planning analyses of the capacity analysis of basic."— Presentation transcript:

1 Lec 18, Ch.9, pp. 359-375 : Basic freeway segment LOS (objectives) Be able to conduct operational and planning analyses of the capacity analysis of basic freeway segmentsBe able to conduct operational and planning analyses of the capacity analysis of basic freeway segments Know which tables should be used to do operational and planning analysesKnow which tables should be used to do operational and planning analyses

2 What we do in class today… Selected students demonstrate how to perform the operational and planning analyses (Examples 9-12 through 9-15)Selected students demonstrate how to perform the operational and planning analyses (Examples 9-12 through 9-15) The instructor relaxes!The instructor relaxes! Zzz …

3 Signal timing with a pedestrian signal Interval Pine St. Oak St. % Veh.Ped.Veh.Ped. 1G-26W-20R-31DW-3136.4 2FDW-610.9 3Y-3.5DW-296.4 4R-25.5 AR 2.7 5G-19W-814.5 6FDW-1120.0 7Y-3DW-55.5 8R-2 AR 3.6 Cycle length = 55 seconds


Download ppt "Lec 18, Ch.9, pp. 359-375 : Basic freeway segment LOS (objectives) Be able to conduct operational and planning analyses of the capacity analysis of basic."

Similar presentations


Ads by Google