Download presentation
Presentation is loading. Please wait.
1
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done
2
April 2006Jean-Sébastien GraulichSlide 2 Goal for BTF Stand alone, local DAQ DAQ Reduced to minimum: Local Start/Stop of Runs (no remote Run Control -> no DAQ framework, no event building) Write data on local Disk Readout particle per particle No interrupts VME-PCI interface: CAEN V2718 only Limited number of FEE modules supported TDC V1290 QDC V972 Only 2 Event types: Particle Event Calibration Event
3
April 2006Jean-Sébastien GraulichSlide 3 Status Manpower: me and 1 undergraduate student Software for V2718: 80% done All fundamentals are done: Read and Write in A32/D32,D16 Read in BLT32, BLT64 Basic I/O Register (2 Inputs, 5 Outputs) Software for V1290: 80% done Only tested with V1190, should be easily transported to V1290 Not fully commissioned yet Software for V792: 40% done Work in progress Software for run control: 25% done Working on User interface
4
April 2006Jean-Sébastien GraulichSlide 4 First results Readout rate of V1190 27 Mbytes/sec in BLT64 -> 5 ms to read the full V1190 buffer memory (Readout of the tracker would require at least 40 Mbytes/sec… already obtained with BIT3 interface -> we might have to deal with 2 different interface. No impact for BTF)
5
April 2006Jean-Sébastien GraulichSlide 5 To be done I need some inputs Define needs for calibration Define needs for online monitoring Define needs for other FEE modules Tests of QDC FEE options will start in background Organize transport of my PC… When is the test beam ?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.