Drift Chambers at DESY and CERN Mike Green, Fabrizio Salvatore, Michele Faucci Giannelli
2
23/01/07Royal Holloway Group2 Work done so far DESY: –Digitization for MC –Efficiency –Drift velocity –Resolution study New: –Update of digitization and track reconstruction –New resolution
3
23/01/07Royal Holloway Group3 Update in processors Paul and Hakan discovered a bug in the code, the ordering of the chamber was correct but when reconstructing there was a swap between DC1 and DC2. Now is correct. 2 now is well defined as: where x are the measurement and y the fitted points
4
23/01/07Royal Holloway Group4 New Resolution Now 1.61 mm it was 1.63, previous result confirmed
5
23/01/07Royal Holloway Group5 Next step of analysis CERN setup: software 90% ready, need a procedure to calculate the “drift velocity”. MC studies: –Single chamber resolution. –Calculate resolution at ECAL FF @ CERN. Release of all new processors in CVS repository (anyone know how to do that?). Study of 2 for real data analysis, add a 3 point fit for DESY in case of bad points. Beam spread issue, further study.