Presentation is loading. Please wait.

Presentation is loading. Please wait.

CE577_Spring 2007 Pavement Management and Rehabilitation Dr. Fouad Bayomy, PE Professor of Civil Engineering

Similar presentations


Presentation on theme: "CE577_Spring 2007 Pavement Management and Rehabilitation Dr. Fouad Bayomy, PE Professor of Civil Engineering"— Presentation transcript:

1 CE577_Spring 2007 Pavement Management and Rehabilitation Dr. Fouad Bayomy, PE Professor of Civil Engineering bayomy@uidaho.edu

2 Course Web Access www.webs1.uidaho.edu/ce577 General Information Syllabus Format and Grading PMS project Exams Others….

3 Overview of PMS Ref: Book Ch 1-3

4 Pavement Management ? PM is a decision making process used to make cost-effective decisions about: Design, Construction, Maintenance, and Rehabilitation of pavements You could add other activities such as planning, budgeting, …etc. Basically, any activity related to “pavements” could be included in an overall PM system.

5 What is a PMS? Decision support TOOL used by pavement personnel to assist in making cost-effective decisions concerning pavements Network Level PMS Project Level PMS Difference: Level of analysis, Level of Data

6 Elements and Links of a PMS Figure 1.3 Book

7 Example of a DOT Organization ITD Organizational Chart Highway Division Planning Pavements Bridges Maintenance Construction Traffic Statistics, ….Data

8 http://www.wsdot.wa.gov/SiteIndex/orgchart_july04.pdf

9 Network-Level PMS Analysis Addresses broad pavement maintenance and rehabilitation issues. Gives general guidance on Fund needs and the level of treatment.

10 Network Level Questions What is the current health of the pavement network?.... Condition index Which pavement sections need work? … Identification Which sections should be worked on first? ….. Prioritization How much money do we need? … budgeting What impact will funding changes have?

11 Basic Network-Level PMS Components 1.Inventory 2.Condition Assessment 3.Needs Analysis 4.Prioritization 5.Impacts of funding decisions 6.Feedback Will be addressed in details later

12 Primary Outputs of Network- Level Analysis Fund needs, Forecasted future conditions, Prioritized listings of work to be done, and Deferred treatment information

13 Project-Level PMS


Download ppt "CE577_Spring 2007 Pavement Management and Rehabilitation Dr. Fouad Bayomy, PE Professor of Civil Engineering"

Similar presentations


Ads by Google