Download presentation
Presentation is loading. Please wait.
1
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 28 th, 2005 E-Logbook 3.5.0 Release Alicia T. Kavelaars Online Engineer SLAC Gamma-ray Large Area Space Telescope
2
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 2 Agenda We will cover: –E-Logbook 3.5.0 New Features –E-Logbook 3.5.0 Fixed Problems –E-Logbook 3.5.0 Documentation –E-Logbook 3.5.0 V&V –Next release: Outstanding Issues
3
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 3 E-Logbook 3.5.0 New Features –Edit and Remove Component capability with QA approval: Can’t remove a component already used in the database. Edits carry throughout window system. –New Doxygen Package Documentation Accessible Online here.here –REAL TIME access to mirrored READ ONLY data copy outside the firewall via local installations of E-Logbook. Full implementation for every Log. Updated every 5 minutes. –New Questionnaire.
4
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 4 E-Logbook 3.5.0 New Features –LAT FHW Matrix Log: Displays currently installed FHW information in grid format: –Serial Numbers –Weights Selectable weight units (Kg or Lb). Printable.
5
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 5 E-Logbook 3.5.0 New Features Addressed JIRA Issues: –Release Notes for E-Logbook 3.5.0Release Notes for E-Logbook 3.5.0 New Features –[ELB-71] - LAT component installation summary report –[ELB-77] - Edit Capability with QA approval for Components in Main Window –[ELB-80] - E-Logbook Questionnaire
6
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 6 E-Logbook 3.5.0 Fixed Problems Addressed JIRA Issues: –Release Notes for E-Logbook 3.5.0Release Notes for E-Logbook 3.5.0 Bug –[ELB-75] - Clear Torque Information on First Demate (If Applicable) –[ELB-76] - Mate action is not passed when cancelling an entry –[ELB-78] - Minor Bugs on Context menu and MMR Print procedures Improvement –[ELB-67] - Ability to have more than one Run Report detail window –[ELB-79] - Reports cannot be closed while creating a record.
7
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 7 E-Logbook 3.4.1 Documentation and V&V Documentation: –LAT-PS-05664-04 released.LAT-PS-05664-04 released. –E-Logbook 3.5.0 Tutorial.E-Logbook 3.5.0 Tutorial. –E-Logbook Website.E-Logbook Website. V&V: –Full Test of E-Logbook 3.5.0 on 06/28/05 passed. –Test Report for E-Logbook 3.5.0 signed off on 06/28/05 by QA and I&T Manager.
8
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 8 Next E-Logbook Release Next Release: Outstanding Issues –Any outstanding JIRA Issues.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.