TRD August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.

Similar presentations


Presentation on theme: "TRD August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007."— Presentation transcript:

1 TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007

2 TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 Pressure sensors/relief valves: Available Pre-Assembly needs to be done (end of August?) Installation needs to be done Improvement/modification of the cooling plant Add an alarm on the total flow. Will be done by the cooling group. 2-3 weeks because of holidays. Remote control. Jorge managed to connect to PLC A. Agustinus will provide generic framework end of August

3 TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 Status of remote control

4 TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 Status of remote control

5 TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 Test with SM-mockup: Being assembled ( finished end of next week) Star test @CERN in all sectors on week 34

6 TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 Pipes 4315 bended pipes ready to be glued pipes glued for ~2 SM in Muenster+~1.3 in HD

7 TRD MEETING@CERN August 2007 A. Marín (GSI) 6/11/2015 Thermal Screen Connections at cooling plant ready


Download ppt "TRD August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007."