IFCT Plan for Next 3 Months Larry Wai June 26, 2003
2
Building 33 Acceptance Plan Setup pager and alarm conditions for building 33 monitoring system Setup procedure for maintenance of monitoring system Setup procedure for alarms, non-conformance Readiness review including QA, SLAC Safety
3
EM Hardware Acceptance Plan Frequent communication by phone with E. Grove and L. Latronico to determine status of CAL and TKR Pre-ship review for CAL (telecon) Pre-ship review for TKR (telecon) Post-ship functional test review for CAL Post-ship functional test review for TKR
4
EM Assembly and Functional Test Plan Preparation of Assembly and Inspection Data Sheets per LAT-MD-1624 Preparation of Assembly Procedure details w/ E. Gawehn; assembly drawings w/ P.Williams CAL Functional test plan per LAT-DS-1502; CAL scripts pre-ship tests at SLAC TKR scripts pre-ship tests at SLAC
5
LAT Assembly and Functional Test Plan LAT electronics assembly procedure details w/ E. Gawehn and D. Nelson using test bed; assembly drawings w/ P.Williams and J.Noriel CAL corner plates, cross-LAT plates details using test coupons w/ M.Molini, others Flight Software test plan w/ J.J. Russell and test bed ACD scripts pre-ship tests at SLAC
6
LAT assembly mockup plan Full mechanical model of the grid lower surface which allows fastening of dummy electronics boxes, CAL base plates, CAL corner plates, cable trays, test instrumentation, cables, EMI skirt, and cross-LAT plates. The mechanical model will be attached to the LAT integration MGSE to facilitate full simulation of LAT integration activity. Electrical test of 1x4 live flight and qual/spare modules, EM PDU, EM GASU, EM EPU, EM SIU, associated cables and flight software. Prototype Comprehensive Test.