Operational Research II By Dr. SW Poon
2
Line of Balance
7
Linear Optimization in Applications Formulation of a linear programming problem Solving a linear programming problem Graphical method
8
Examples on Simplex Method
14
Integer Programming Solution
21
Sequencing and simulation (R. Pilcher)
22
Sequencing and simulation Sequencing A number of jobs, two stations
24
A number of jobs, three stations The minimum processing time at station 1 is greater than or equal to the maximum processing time at station 2 The minimum processing time at Station 3 is greater than or equal to the maximum processing time at station 2
26
Two jobs, a number of stations
27
Shortest routes through networks Graphical analysis of shortest-path problems
29
Monte Carlo Simulation A Monte Carlo simulation is a dynamic model of a situation, which results in a picture of the likely operation of the subject being modeled over a period of time Example 16.4 A site concrete mixer produces 1m 3 of concrete at each mixing. During a large pour of concrete, a wet hopper is used in front of the mixer into which the mixed concrete is discharged prior to being loaded into trucks. The wet hopper has a maximum capacity of 3 m 3. The cycle time from discharge to discharge in mixing 1m 3 of concrete is studied and the frequency distribution shown in Table 16.6 results.