Team M1 Enigma Machine Milestone 7 - 26 March, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design.

Similar presentations


Presentation on theme: "Team M1 Enigma Machine Milestone 7 - 26 March, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design."— Presentation transcript:

1 Team M1 Enigma Machine Milestone 7 - 26 March, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design Manager: Prateek Goenka

2 Status Finished: –Behavioral Verilog and C simulation –Structural Verilog –Logic optimization –Module-level spice delay and power simulations –Floorplan –Top-level schematic testing In Progress: –Functional block layout –Simulation of functional blocks To do: –Global Layout –Testing –Simulation STATUS

3 Layout done:Layout Needed: GatesROM Muxes and RegistersRAM DFF, TFF FlipflopsFSM Add_Mod263-bit and 5-bit serial input registers Wheel Counter CellsWheel Counter

4 Design Decisions Finalized the SRAM design Layout of Add_Mod26 Layout of 3-bit and 5-bit counter cells Updated layout of Wheel Counter Floorplan

5 Initial Floorplan

6 UPDATED FLOORPLAN

7 Schematic Delay: 68ps ExtractedRC Delay: 94ps Register

8 Schematic of Add_Mod26

9 LAYOUT OF ADD_MOD26

10 LOOKAHEAD MODULE LAYOUT

11 LOOKAHEAD 2 MODULE LAYOUT

12 SUBTRACTOR MODULE LAYOUT

13 3-bit Comparator

14 3-bit Counter Cell 3, 1-bit T Flips FlopsCount Logic

15 3-bit Counter

16 5-bit Counter Cell 5, 1-bit D/T Flips Flops Count Logic w/ Reset at 26

17 Wheel Counter Plan (Module layout and wire planning) 5-bit Counter Cell Data from counters Wheel Select Wheel Position 5-bit Counter Cell