Download presentation
Presentation is loading. Please wait.
1
Chandra Users’ Committee, 29-30 Oct 2009 Chandra Director’s Office Cycle 11 Peer Review Proposal Numbers: 668 submitted proposals *5.6 oversubscribed (based on time) 50 LP, 9 VLP 65 Archive 40 Theory
2
Chandra Users’ Committee, 29-30 Oct 2009 Chandra Director’s Office Total Time Request Time allocated: +5.8% Final oversubscription: 5.2 Grating request -48%
3
Chandra Users’ Committee, 29-30 Oct 2009 Chandra Director’s Office Over-subscription by Category LP/VLP competed for full 6 Msec Over-subscription: 6.65 12 LP, 1 VLP approved
4
Chandra Users’ Committee, 29-30 Oct 2009 Chandra Director’s Office Allocation by Instrument and Science Category
5
Chandra Users’ Committee, 29-30 Oct 2009 Chandra Director’s Office Gratings Proposals HETG request: - 40% % Targets approved ~20% Time/target: 80ks (3x ACIS) #targets: 60 (4% of ACIS) → fluctuations due to small # statistics
6
Chandra Users’ Committee, 29-30 Oct 2009 Chandra Director’s Office Archive/Theory Results Archive: Budget: $1100K Allocated $1386K (20) Over-subscription: 3.3 Theory: Budget: $520K Allocated: $960 (11) Over-subscription: 3.3 Reason: panel grading and priorities Total funds: +$300K Observing funds: -$426K
7
Chandra Users’ Committee, 29-30 Oct 2009 Chandra Director’s Office Peer Review 21-24 June 2009, Hilton, Logan Airport 13 topical panels, 1 Big Project Panel (BPP) Panels: 1,2: Stars, Planets 3,4: SN, SNR, NS 5,6,7: Binaries, Galaxies: Populations 8,9,10: Clusters, Galaxies: Diffuse 11,12,13: AGN, Extragalactic surveys Recommended target list posted: 17 July Letters (detailed reports, fair share budget) e-mailed: Aug 13 Cost Proposal deadline:17 Sept 2009
8
Chandra Users’ Committee, 29-30 Oct 2009 Chandra Director’s Office Other Peer Review Results Constrained Observations: Same as last year (Easy: 45; Average 35; Diff. 20) Joint allocated: 5E; GTO: 5A, 8E Review Allocated: Diff: 8/20; A+E: 94/64; If 1D=2(A+E), over by 6; ok’d by MP Highest unapproved TC grade 3.8 (requesting 8) Keep the same for Cycle 12 Cost Review: External review required for 17 proposals asking for > fair share
9
Chandra Users’ Committee, 29-30 Oct 2009 Chandra Director’s Office Cycle 12 Updates RPS: option to check SIMBAD/NED in advance of submission Radiation Zone information: available as table with links from ProVis, Proposer page etc. Archive: separate allocation of money for CDFS-related archive studies (using DDT funds) LP/VLP Review: Restore separate LP/VLP allocations and separate BPP discussion 3 Msec for each allocation, allowing small movement of boundary in either direction E/PO Funding: discontinued
10
Chandra Users’ Committee, 29-30 Oct 2009 Chandra Director’s Office Students and Chandra Annual survey to Chandra PIs requesting input on students (UG and PG) and postdocs working on Chandra projects. Total numbers are ~250 per year (not unique), most of whom are supported by Chandra grants Example Breakdown, 2005: 49 UG, 110 PG, 82 PD PhDs using Chandra data, up to 2007: 120 PhDs worldwide (lower limit), average of 20 per year Chandra serves as a key training ground for young scientists and provides funding to promote US-based training
11
Chandra Users’ Committee, 29-30 Oct 2009 Chandra Director’s Office Recent and Upcoming events SNR and Pulsar Wind Nebulae in the Chandra Era 8-10 July, Cambridge, presentations on website Chandra’s First Decade of Discovery: 22-25 Sept 2009 Full program; exciting science, astronauts’ visit, Harbor Cruise Einstein Fellows Symposium: 27-28 Oct Application Deadline: 5 Nov Cycle 12 Schedule: CfP release: 15 Dec 2009 Proposal deadline: 18 March 2010 Peer Review: 21-25 June 2010 NASA Senior Review 2010: Due 8 Feb 2010 CXC Website: New-look top Science pageNew-look top Science page
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.