Pandora’s Box Project Epimetheus Proposal  Charles Bogenberger- team manager  Michael Curl- electrician and systems integration  Nicole Demandante-

Similar presentations


Presentation on theme: "Pandora’s Box Project Epimetheus Proposal  Charles Bogenberger- team manager  Michael Curl- electrician and systems integration  Nicole Demandante-"— Presentation transcript:

1 Pandora’s Box Project Epimetheus Proposal  Charles Bogenberger- team manager  Michael Curl- electrician and systems integration  Nicole Demandante- O3 sensor  David – camera and structure  Lisa Rowan- Budget, schedule, and organization  Juhyun Lee- graphics and videography  Aleks Jarosz- accelerometer and structure

2 Structural Redesign  Design  Changed from cube to rectangular  Shape redesigned around camera  Cut out for mirrors  Better imaging of earth and balloon  Protects mirrors  Better positioning of camera  Allows for more imaging options  Improved impact absorption and structural strength

3 Parts and Components Status  Have all major components  Having to spend more on miscellaneous parts  O 3 Sensor  Three out of four chemicals here fourth one on its way  Chemicals took longer to get.  This experiment will be practically impossible to test.  Force sensor  Accelerometer not feasible  Will probably use home made device

4 Stair Pitch Test  No critical damage done  Performed several tests:  Pitched downward from 1 story  Pitched up to a height of 3 stories and freefall  New Design showed improved impact absorption  Major damage was to corners  Overall structurally sound

5 Cold Test  Attempted Cold Test on Sunday 2/11/03  Status: INCOMPLETE  HOBO failed  Timing Circuit failed  All other components were functioning  Cold test will be re-done ASAP depending on diagnosis  Parts may need to be re- ordered  Projected re-evaluation on Sat.

6 Budget MaterialsCostFuture Spending Cost Aluminum Tape$5.25Film Development $20.00 Glue gun, mirrors, foam core, American flag stickers $14.24 Fasteners, Aluminum Tape $3.56What we have left $54.18 9V, 12V Batteries $27.54 Foam Core and Blade Knife $10.54 Spray Paint, Silicon, and Film $16.74 Chemicals$48.00 Total Spent $125.82

7 Timeline  November 3Launch Readiness Review #1  November 4Assessment of Launch Readiness  November 17Modifications completed for Launch Readiness Review #2  November 19Launch Readiness Review #2  November 202nd round modifications completed  November 22Launch Day  November 25Prepare Final Report and Presentation  December 4Complete Final Report and Presentations  December 6ITLL Design Expo  December 8Final Reports and Team Presentations

8 Questions?