Download presentation
Presentation is loading. Please wait.
1
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB http://cern.ch/proj-hiptarget VRVS session, Jan. 2006
2
VRVS, Jan. 2006 CERN AB-ATB PS beam, 2 Agenda Friday 3 rd February 2006, 9:00 (room: Salle A) Agenda: Morning session Introduction to review 20′′ Magnet 40′′ Cryogenics 40′′ Lunch break Reviewers – recommendations/questions Summary Speakers should prepare a talk of 40 min. All preparations will be followed by discussion Expected end : 15:30
3
VRVS, Jan. 2006 CERN AB-ATB PS beam, 3 Guidelines for Presentations Introduction of the system Key components and functionality Safety issues involved Production: status and tests at factory Installation Operational scheme Respect allocated time!
4
VRVS, Jan. 2006 CERN AB-ATB PS beam, 4 Schedule until Review A set of documentation should be provided in advance, which will be submitted to the reviewers for preparation. Guidelines/skeleton will be distributed on 23.Jan. Documentation should be provided by Monday 30.Jan. to the reviewers Documentation should include: engineering drawings calculations specifications functionality description installation concerns
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.