ARNAB BANERJEE Variable Energy Cyclotron Centre, India
2
VECC participation a.Build ~10% of the MRPC modules (~12 + spares) b.Will provide hardware for the entire low voltage system c. Take part in data analysis, calibration, simulation
3
L ~ 10 km for down going ~12000 km for up going E~ few MeV-100GeV Down near detector no oscillation Up far detector Oscillation Oscillation of atmospheric neutrinos L’L’ L = P( ; L/E) N up (L/E) N down (L’/E) 3 RPC/MRPC building experience at VECC 1.Facilities developed for RPC R&D for India-based Neutrino Observatory (INO):
4
INO Detector Iron Calorimeter (ICAL) Mass: 50 kTon Size : 48 m (x) 16m (y) 12 m (z) 140 layers of 6 cm thick iron with 2.5 cm gap for active elements Magnetic field ~ 1 Tesla along y-direction 4
5
Two 2 mm thick float Bakelite Separated by 2 mm spacer 2 mm thick spacer Resistive plates Complete RPC Graphite coating on the outer surfaces of Resistive plates Pickup strips Resistive Plate Chamber for INO 5
6
Full facility for testing 12- RPCs simultaneously and forming tracks in mag. Field 8 Glass RPC + 4 Bakelite RPC 1 Tesla Uniform magnetic field 1m x 1m Bakelite RPC build at VECC gas system HV LV FEE
7
2. Double Gap Bakelite MRPC: Bakelite: procured locally. Dimension: 30 cm X 20 cm 3. Four Gap Bakelite MRPC: Dimension: 23 cm X 23 cm 10 mm 230 mm Perspex base Grooving for gas flow (4 mm X 2 mm) 230 mm 7
9
4. Six Gap Glass RPC: Dimension : 20 cm X 8 cm Graphite paint is used as conductive material 9 Glass: procured from GSI Glass Thickness: 600 μm Gas gap: 200 μm
10
cosmic-ray test setup Gas distribution system (MFC based) Gas: Ar, iso-butane, SF 6, Freon(R134a) Can be adjusted for both streamer & avalanche mode
11
Schematic representation of cosmic ray setup Master trigger signal = SC1.AND. SC2.AND. SCF Efficiency = (RPC count in coincidence with master trigger) (Master trigger count) 11 Time resolution : START with Master trigger STOP with MRPC
12
Efficiency > 90% Time resolution (FWHM) ~ 3 ns 1.1m X 1m Bakelite RPC 2. Bakelite MRPC Efficiency > 95% Time resolution(FWHM) ~ 2 ns 3. Glass MRPC Efficiency > 90% Time resolution ~ 500 ps (σ)
13
Facility at VECC for LMRPC production for MTD: New Lab for LMRPC production Gas distribution system HV Cosmic setup
14
Requirements from the collaboration: Read-out system ( electronics for high time resolution measurement) Raw materials (glass, fishing line, scintillators, etc.) Pick-up strips Painting materials & procedure Are they centrally available ???
15
Production Plan: After having all the raw materials ModuleTime 1~ 20 days 12~ 1 years Fabrication : Testing : ModuleTime 12~ 1.5 years After having all the Read-out system If required we can do both the fabrication and test simultaneously
16
Analysis: Analysis is going on for : RUN10 : Cosmic RUN9 : p-p collision plots indicates the position of the MTD properly Plots for RUN10 cosmic: