1 “Gilbane Gold” PHIL/ENGR 482 ETHICS & ENGINEERING Gilbane Gold Case Study

2 Taxonomy of Obligations XTo whom does an engineer have obligations? s To self? s To others? l Family and friends l Employer and fellow employees l Fellow professionals l Clients/Consumers/3 rd Parties l Public; including future generations s To the environment?

3 Sources of Obligations XParticular roles s Parent, Engineer, … XPromises and Contracts XBeing a Human Being

4 Gilbane Gold Background

5 Allowable Lead and Arsenic Concentration in Wastewater Note:

6 Assumptions: X250,000 gal/day wastewater before expansion XOld test methods indicated 5 ppb lead, ok. XNew test indicates 7.5+ ppb lead XLegal limit is 7.5 ppb lead XPlanned expansion will cause 500% increase in wastewater (and lead) volume

7 Impact of proposed expansion... XWastewater s Current: 250,000 gal/day s Future: 1,250,000 gal/day XLead s Current: 250,000 g/day @ 7.5 ppb = 5.7 lb/day s Future: 1,250,000 g/day @ 7.5 ppb = 28.5 lb/day

8 Option 1 The solution to pollution is dilution.

9 A problem…? X When trying a new and more accurate test method, we discover that the plant is discharging wastewater concentrations at or above the legal limit of 7.5 ppb lead… X Regulations do not require the new test method be used... 0.25 Mgpd Wastewater @7.5ppb lead 7.5 ppb Wastewater treatment plant Sludge + treated effluent

10 A bigger problem…? X A proposed production increase will increase the amount of wastewater 500%... 1.25 Mgpd Wastewater @7.5ppb lead 7.5 ppb Wastewater treatment plant Sludge + treated effluent

11 A potential solution? “The solution to polution is dilution…” X It is proposed to dilute effluent to achieve an acceptable concentration, say 5.75 ppb... 1.25 Mgpd Wastewater @7.5ppb lead 6 ppb Wastewater treatment plant Sludge + treated effluent 0.4 Mgpd Clean H 2 O

12 Annual cost of 0.4 Mgpd water... XFresh water purchase s (@ $0.25/1,000 gal) = $35,000 XIncremental sewage charges s (@ $0.75/1,000 gal) = $105,000 XTotal annual cost = $140,000

13 Potential solution 2? Ion Exchange

14 Capital Cost

15 Potential solution 3? Artificial Wetland

16 Summary of three possible solutions