Cigre B5 2005 Doowon Technical College Korea 1 Q12. How does one assure that SAS specification developed in 2005 allows for future solutions taking advantage.

Similar presentations


Presentation on theme: "Cigre B5 2005 Doowon Technical College Korea 1 Q12. How does one assure that SAS specification developed in 2005 allows for future solutions taking advantage."— Presentation transcript:

1 Cigre B5 2005 Doowon Technical College Korea 1 Q12. How does one assure that SAS specification developed in 2005 allows for future solutions taking advantage of the continued SAS evolution and functional consolidation? Ans.: It ’ s hard to assure the future advantage with 2005 specification. The spec. must be changed or up-dated step by step phase.

2 Cigre B5 2005 Doowon Technical College Korea 2 Why step by step? Process level equipments and devices in substation are not digitalized yet. IEC-61850 standard still continues to grow(supplemented & matured). High level AI technology may be applied using many data & information in SAS. Networking communications between substations will become further essential for utilities. All above may be continued to change.

3 Cigre B5 2005 Doowon Technical College Korea 3 Four Steps of SAS specification 1.0 Step : Station Bus Applied------- (2005) (Bay Level IED Com.  1/2 Digitalized) 1.5 Step : Process Bus Applied ------(2007) (Some Bay Level IED Com.  Fully Digitalized ) 2.0 Step : All IED Com. Fully Digitalized(2010) (Cable-less Substation) 3.0 Step : Intelligent Substations----- (2012) (Many Intelligent Functions Applied) 4.0 Step : Networked Substations -----(2015)

4 Cigre B5 2005 Doowon Technical College Korea 4 IEC 61850 Based SAS (1.0 Step) Conventional Switchgear or Equipment Conventional Switchgear or Equipment Bay Control IED IED for line IED for Bus Bay Control IED IED for D/L HMI Engineering Control Center Ethernet Switch Gateway IEC 61850-8 Conventional CT/VT’s Conventional CT/VT’s IED for Tr. Network Monitoring S/W Process Level Bay Level Station Level All IED Com.Half- Digitalized

5 Cigre B5 2005 Doowon Technical College Korea 5 Four Steps of specification 1.0 Step : Station Bus Applied------ (2005) (Bay Level IED Com.  1/2 Digitalized) 1.5 Step : Process Bus Applied -----(2007) (Some Bay Level IED Com.  Fully Digitalized ) 2.0 Step : All IED Com. Fully Digitalized(2010) (Cable-less Substation) 3.0 Step : Intelligent Substations-----(2012) (Many Intelligent Functions Applied) 4.0 Step : Networked Substations -----(2015)

6 Cigre B5 2005 Doowon Technical College Korea 6 Unconventional CT/VT’s Unconventional CT/VT’s HMI Engineering Control Center Ethernet Switch Router IEC 61850-8 IEC 61850-9 IEC 61850 Based SAS (1.5 Step) Process Level Bay Level Station Level Conventional Switchgear or Equipment Conventional Switchgear or Equipment Bay Control IED IED for line IED for Bus Bay Control IED IED for Tr. IED for D/L Some IED Com. Fully Digitalized Some Process Equip. Digitalized

7 Cigre B5 2005 Doowon Technical College Korea 7 Four Steps of specification 1.0 Step : Station Bus Applied------ (2005) (Bay Level IED Com.  1/2 Digitalized) 1.5 Step : Process Bus Applied -----(2007) (Some Bay Level IED Com.  Fully Digitalized ) 2.0 Step : All IED Com. Fully Digitalized(2010) (Cable-less Substation) 3.0 Step : Intelligent Substations-----(2012) (Many Intelligent Functions Applied) 4.0 Step : Networked Substations -----(2015)

8 Cigre B5 2005 Doowon Technical College Korea 8 IEC 61850 Based SAS (2.0 Step) Unconventional Switchgear / Equipments Unconventional Switchgear / Equipments HMI Engineering Control Center Ethernet Switch Router IEC 61850-8 Ethernet Switch IEC 61850-8 IEC 61850-9 SPS Network Gateway Process Level Bay Level Station Level All IED Com. Fully Digitalized Bay Control IED IED for line IED for Bus Bay Control IED IED for Tr. IED for D/L Unconventional CT/VT’s Unconventional CT/VT’s All Process Equip. Digitalized

9 Cigre B5 2005 Doowon Technical College Korea 9 Four Steps of specification 1.0 Step : Station Bus Applied------ (2005) (Bay Level IED Com.  1/2 Digitalized) 1.5 Step : Process Bus Applied -----(2007) (Some Bay Level IED Com.  Fully Digitalized ) 2.0 Step : All IED Com. Fully Digitalized(2010) (Cable-less Substation) 3.0 Step : Intelligent Substations-----(2012) (Many Intelligent Functions Applied) 4.0 Step : Networked Substations -----(2015)

10 Cigre B5 2005 Doowon Technical College Korea 10 HMI Engineering Control Center Ethernet Switch Router IEC 61850-8 Ethernet Switch IEC 61850-8 IEC 61850-9 IEC 61850 Based SAS (3.0 Step) SPS Network Gateway 프로세스 Level Bay Level Station Level Unconventional Switchgear / Equipments Unconventional Switchgear / Equipments Bay Control IED IED for line IED for Bus Bay Control IED IED for Tr. IED for D/L Unconventional CT/VT’s Unconventional CT/VT’s Many Intelligent Functions All IED Com. Fully Digitalized

11 Cigre B5 2005 Doowon Technical College Korea 11 Four Steps of specification 1.0 Step : Station Bus Applied------ (2005) (Bay Level IED Com.  1/2 Digitalized) 1.5 Step : Process Bus Applied -----(2007) (Some Bay Level IED Com.  Fully Digitalized ) 2.0 Step : All IED Com. Fully Digitalized(2010) (Cable-less Substation) 3.0 Step : Intelligent Substations-----(2012) (Many Intelligent Functions Applied) 4.0 Step : Networked Substations ----(2015)

12 Cigre B5 2005 Doowon Technical College Korea 12 IEC 61850 Based SAS (4.0 Step) n Substation HMI Control Center Com. Network Controller Gateway Power Plant /DG Network SPS Gateway Power System Level Station Level A Substation Interconnected Substations B Substation

13 Cigre B5 2005 Doowon Technical College Korea 13 Four Steps of specification 1.0 Step : Station Bus Applied------ (2005) (Bay Level IED Com.  1/2 Digitalized) 1.5 Step : Process Bus Applied -----(2007) (Some Bay Level IED Com.  Fully Digitalized ) 2.0 Step : All IED Com. Fully Digitalized(2010) (Cable-less Substation) 3.0 Step : Intelligent Substations-----(2012) (Many Intelligent Functions Applied) 4.0 Step : Networked Substations ----(2015)

14 Cigre B5 2005 Doowon Technical College Korea 14 Thank you for your attention.

15 Cigre B5 2005 Doowon Technical College Korea 15 Existing Substations Relay A Relay B Relay A Relay B Interlocking logic Control Center HMI RTU Conventional Switchgear or Equipment Conventional Switchgear or Equipment Conventional CT/VT’s Conventional CT/VT’s