Download presentation
Presentation is loading. Please wait.
1
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006
2
Review Process The review process for the downstream PID detectors will be the same as we are doing for the upstream at this meeting Charge: u Have the simulation studies/analyses accurately and reliable defined the detector needs for the experiment? u Is the design specification sufficient to meet the needs of the experiment? u Is it likely that the proposed system(s) (detector, electronics, DAQ) can achieve this specification? u Are the risks fully understood and being appropriately managed? u Is the proposed schedule realistic in terms of the available resources: funding and people? u Is the schedule likely to lead to a timely installation in the MICE hall? u Are the infrastructure needs clearly defined and being addressed? u The review is also free to pick up on issues which may arise during the review and are not covered by the above. The format will also be the same We plan to hold the review at Frascati or possibly in conjunction with a future MICE CM
3
Downstream PID Review Status Since there are still open questions regarding the design of the DS-PID: Magnetic shielding, detector size, calorimeter basic design, it is premature to schedule the DS-PID review at this time We propose that we have a 1-2 day workshop in Frascati to help advance (finalize?) the design of the DS-PID systems in early December We will try to pin down a date in the next 2 weeks. Afterwards we should be in a better position to determine when to schedule the actual review
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.