1 MICE Tracker workshop, 06Nov. 20061 Waveguides for Station5 H. Sakamoto / M. Yoshida

2 MICE Tracker workshop, 06Nov. 20062 G.Barber 1400 mm

3 MICE Tracker workshop, 06Nov. 20063 External waveguide 2900  29 mm 2100mm 1 2 3 4 5 6 7 8 121 122 … 128 12 11 … … 1 128 … 121

4 MICE Tracker workshop, 06Nov. 20064 1 2 3 4 5 6 7 8 121 122 123 124 125 126 127 128 External waveguide Polished face Mirrored Numbering

5 MICE Tracker workshop, 06Nov. 20065 Production process 1.Cut 2.Assembly with testing cookie 1.All connectors are set in fiber bundle ( including internal&external ) 2.Mapping is completed at this step. 3.Polish 4.1 st transmission test 5.Cutting testing cookie away 6.Glueing and making internal.& external. separately. 7.Polish 8.2 nd transmission test 9.Shipping to FNAL toward final polishing. -> Imperial College.

6 MICE Tracker workshop, 06Nov. 20066 Assembling scheme D0 connector Testing cookie Elastic bands Station connector External region Internal region Table

7 MICE Tracker workshop, 06Nov. 20067 Plans Bulkhead connectors will arrive at G-Tech at beginning of November? Assembly with test cookie (previous slide) ~1 week Transmission test @ G-Tech factory ~1 day –Now, Takatomi is tuning the testing method at Osaka Univ. First module will complete at End of November ~1 week Production assessment test ~1 day –Check stress on fibers –Final transmission test. Complete the remaining modules ( 4 modules ) ~2 week