Download presentation
Presentation is loading. Please wait.
1
K. Long, 12 June 2015 Project manager report WBS revision Technical Board Membership Meetings
2
Work breakdown structure: revision
3
Plan for this week: Cummings, vacuum, radiation shutter, window, KL, Pietro Review at TB Present revised version to CB
4
Schedule revision: Review of WBS and schedule: November 2007
5
Technical Board:
6
Technical Board: membership: Collaboration charter: Extract:
7
Technical Board: membership: TB chair: Project Manager/Technical Coordinator Apsimon, Nichols Heads of all Technical subprojects WBS level 2 managers: Long (MMB), Nelson (MH&I), Bross (Instr.), Zisman (channel) RAL infrastructure representative Nelson Integration Engineer Lau Software chair Ellis Analysis coordinator Cobb Spokesperson Blondel Deputy Spokesperson Zisman Chairperson, Collaboration Board Long Others by invitation: E.g. WBS level 3 managers to report on status, schedule, plans etc.
8
Technical Board: standing items
9
Resource issues: MICE slow controls coordinator Online computer system Technical effort: Opporunity to learn systems at RAL Increased effort in the Hall
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.