Steve Lewis XTOD Controlssalewis@llnl.gov 24-28 October, 2005 UCRL-PRES-210834 1 LCLS Week/FAC 24-28 October, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics: Controls Status
2
Steve Lewis XTOD Controlssalewis@llnl.gov 24-28 October, 2005 UCRL-PRES-210834 2 Major Effort Areas Naming and counting all devices Block diagrams of entire system Aligning XTOD controls hardware with LCLS global standards Completing cost+schedule Installing EPICS and PLC software at LLNL
3
Steve Lewis XTOD Controlssalewis@llnl.gov 24-28 October, 2005 UCRL-PRES-210834 3 Naming/Counting Devices Comprehensive spread-sheet is complete LCLS-conformant names selected Full “chain” enumerated: device cable controller/PLC cable IOC Equipment costs tallied Effort costs tallied: Mgmt + EDI + unit Block Diagrams are complete Also matches mechanical layout
4
Steve Lewis XTOD Controlssalewis@llnl.gov 24-28 October, 2005 UCRL-PRES-210834 4
5
Steve Lewis XTOD Controlssalewis@llnl.gov 24-28 October, 2005 UCRL-PRES-210834 5
6
Steve Lewis XTOD Controlssalewis@llnl.gov 24-28 October, 2005 UCRL-PRES-210834 6 Cost Summary =5 FTEs
7
Steve Lewis XTOD Controlssalewis@llnl.gov 24-28 October, 2005 UCRL-PRES-210834 7 LCLS Global Standards… Motors: Newport XPS single-box: turnkey; TCP/IP field-bus; driver and motor record from APS Cannot “set position”; may need alternate for powerful motors Cameras: Camlink compatible from SLAC IOCs: VME/6100 when EVR required ‘Small’ IOC? Want RTEMS+EPICS+drivers+‘breakout’ engineering
8
Steve Lewis XTOD Controlssalewis@llnl.gov 24-28 October, 2005 UCRL-PRES-210834 8 LCLS Global Standards… Vacuum Choices for Gauges MKS-937A w/317-CEP and 422-CCG 15msec response option Choices for Ion Pumps MPS-2 SafeCONN w/StarCell PLC: Allen-Bradley CLX-5000 for processor Flex-I/O for distributed I/O EtherIP+serial from SNS
9
Steve Lewis XTOD Controlssalewis@llnl.gov 24-28 October, 2005 UCRL-PRES-210834 9 V G P C IOC <=PLC-to-IOC & PLC-to-PLC: Ethernet/IP <=IOC-to-OPI: Ethernet/CA G C Controller-to-IOC: Serial=> <=Hardware-to-PLC: analog O I/O PLC Operator uses portable console –Gauge/controller read-outs available –Optional valve panel PLC provides both single-sector and global control –Analog wiring to devices –Delegate to smart gauge controller EPICS uses Ethernet/IP for full access –Star-wiring to switches –Additonal serial path for more details EPICS “master” sequencing available
10
Steve Lewis XTOD Controlssalewis@llnl.gov 24-28 October, 2005 UCRL-PRES-210834 10 EPICS at LLNL 2 Linux servers operational Working w/SLAC group on clean build PLC Software w/PC in house Will install soon FY06 Prototype Gas Attenuator and Vacuum Prototype Motors, Cameras, and IOCs R&D on Diagnostics
11
Steve Lewis XTOD Controlssalewis@llnl.gov 24-28 October, 2005 UCRL-PRES-210834 11 EPICS at LLNL FY07 Procure all H/W Configure EPICS Design Diagnostics FY08 Complete Diagnostics Commission