Presentation is loading. Please wait.

Presentation is loading. Please wait.

Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 15 Monday 4/2.

Similar presentations


Presentation on theme: "Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 15 Monday 4/2."— Presentation transcript:

1 Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 15 Monday 4/2

2 2 Outline Last Week Current Week Calibration Program Autodecouple Program

3 3 Last Week Code Calibration Program –Set voltage thresholds for specific sensor –Integrate with Main program –Test function coded within

4 4 Current Week Finish Calibration Program –Some more coding –Test and Debug program Start Autodecouple Program –Finish stage 1 by end of week –Test program

5 5 Timeline

6 6 Calibration Progam Almost done coding Test one sensor before all four Set up hardware for it A/D channels 0-3 are for sensors BL,BR,ML,MR –Sensors are labeled on layout

7 7 Autodecouple Program Start and Finish Stage 1 of 3 –Stage 1 – remove cars after desired one –Stage 2 – remove desired car –Stage 3 – put train back together Each stage has two parts –Part A is before the decoupler –Part B is after the decoupler Pause when switch needs to be flipped –Keypress to begin next stage

8 8 Potential Problems Timing issues when using A/D converter and setting up DCC signals together Keypress to resume autodecoupling operations Developing the Calibration Program in a way to make it a one time use Train speed and photocell’s rate of light detection

9 9 Questions? The End


Download ppt "Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 15 Monday 4/2."

Similar presentations


Ads by Google