Download presentation
Presentation is loading. Please wait.
1
Othello "A minute to learn, a lifetime to master"
2
Group Progress Completed Requirements Document Completed Design Completed Planning Backups are online and functional
3
Group Progress Cont. Implementation is being finalized Testing 90% Completed “Glamour Effect” will be completed Final Project Presentation/Demo Not Started
4
Proposed Solutions Convert the SAF-B to an electronic web-based system Employ a Admin/User end of the system Increase Productivity / Efficacy
5
Finalized Solutions Othello succeeded in converting the SAF-B to a web-based electronic system Implemented a Admin/User based system Vastly improved the productivity and efficacy of the SAF-B
6
Group Links -Group Coding Site http://othello.homelinux.org/websvn/listing. php?repname=safb&path=%2F&sc=0 -Group Project Site http://students.depaul.edu/~efinnera/394/p roj.html
7
Preview Demo http://finneran.us/394/
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.