Presentation is loading. Please wait.

Presentation is loading. Please wait.

In Your Face Test Plan & Initial Expected Data Anish Mathur, Rushikesh Sheth, Brian Thompson & Sunny Atluri.

Similar presentations


Presentation on theme: "In Your Face Test Plan & Initial Expected Data Anish Mathur, Rushikesh Sheth, Brian Thompson & Sunny Atluri."— Presentation transcript:

1 In Your Face Test Plan & Initial Expected Data Anish Mathur, Rushikesh Sheth, Brian Thompson & Sunny Atluri

2 Test Plan Sensor TestingSensor Testing –Range –Response Time –Precision Software TestingSoftware Testing –Throughput –Startup Time

3 Expected Results Sensor DataSensor Data –Range should follow chart –< 5% error Software TestingSoftware Testing – > 10 ops per second –< 1 sec startup time

4 Initial Results

5

6

7 Average Start Up Time: 3.0652 sec.Average Start Up Time: 3.0652 sec. Average Throughput: 9.353 operations/sec.Average Throughput: 9.353 operations/sec.


Download ppt "In Your Face Test Plan & Initial Expected Data Anish Mathur, Rushikesh Sheth, Brian Thompson & Sunny Atluri."

Similar presentations


Ads by Google