24th May 20021 PARTICIPATION OF IFIC Coordinated Project Plan Nacional de Altas Energías y Grandes Aceleradores IFIC (Instituto de Física Corpuscular) Universitat de València-CSIC
2
24th May20022 Contents 4 I.- Main Areas of Interest 4 II.- Infrastructure in Valencia 4 III.- GRID activities 4 IV.- ATLAS Computing
3
24th May20023 I.- Main Areas of Interest 4 Fabric Management and Operation –Automatization –Monitoring 4 Experiment -oriented use of the farm –Data Challenges in ATLAS (Monte Carlo Production) –Data Analysis
4
24th May20024 II.- Infrastructure at IFIC GoG (Grupo de Ordenadores para el GRID) Farm 4 192 Athlon PC (134 IFIC + 58 ICMOL) –VIA KT133A & KT266A based MotherBoard –CPU: AMD Athlon K7 @ 1.2 & 1.4 GHz –RAM: 2x512 Mbytes (SDRAM & DDR SDRAM) –HD: 40 Gbytes –NIC: 3COM 905CX & RealTek RTL8139 (Fast Ethernet + PXE) –2U chassis
5
24th May20025 GoG Farm 4 9 racks (800x600 mm) 4 22 PCs + 1 network switch per rack 4 2U chassis with 3 fans –pros: less space required –cons: add 240 euros per PC (aprox.) heat concentration
6
24th May20026 GoG Farm
7
24th May20027 GoG Farm (front view)
8
24th May20028 GoG Farm (back view)
9
24th May20029 Local Network
10
24th May200210 Local Network 4 All Worker Nodes have private IP addresses in the net 192.168.4.0/22 –secure environment –administrative independence from University network management staff 4 Communication equipment have public IP addresses in the net 147.156.149.64/26 –can be monitored and upgraded from University centralized service
11
24th May200211 Infrastructure in Valencia : Human resources 4 5 staff persons + 1 postdoc ( EDP = 3.5) 4 support from the Informatic Section of IFIC 4...(2 new contracts in the next two months)
12
24th May200212 III - GRID Activities 4 In DataGrid, involved in WP6 (Testbed and Demonstrators) 4 In CrossGrid: –HEP Data Analysis (CrossGrid Appl. Development) –New GRID Services and Tools (Resource Management and Integration) –International Testbed Organisation –
13
24th May200213 IV- ATLAS Computing 4 Data Challenges, involved in phase 1: full chain implemented and tested at IFIC Event generator Det. SimulationReconstruction Analysis Files: Dijets and Zjets (10 Kevts) Computing Resources available from June to December: 100 PC’s (4 KSpecInt95) Massive Production (10**7 evts for the whole ATLAS Coll.): with EDG 1.2 by the end of June