Download presentation
Presentation is loading. Please wait.
2
TaskFFA SubtaskDue Date SUPPLEMENTAL INVESTIGATION (OFFSHORE) Submit Draft Report - FFA Date2/2/2012 ENGINEERING ESTIMATE/COST ANALYSIS (EE/CA) (OFFSHORE) Submit Draft EECA - FFA Date8/15/2012 FEASIBILITY STUDY (FS) Submit Draft FS Report - FFA Date 3/28/2013 PROPOSED REMEDIAL ACTION PLAN (PRAP) Submit Draft PRAP - FFA Date10/9/2013 RECORD OF DECISION (ROD)Submit Draft ROD - FFA Date12/23/2013
3
TaskFFA SubtaskDue Date ENGINEERING EVALUATION/COST ANALYSIS (EECA) REPORT (SOIL) Submit Draft EECA (Soil) – FFA Date 7/29/2011 ACTION MEMO (SOIL) Submit Draft Action Memo (Soil) – FFA Date 12/23/2011 REMEDIAL INVESTIGATION (RI) Submit Draft RI Work Plan – FFA Date 11/30/2011 Submit Draft RI Report – FFA Date 12/9/2012 FEASABILITY STUDY (FS)Submit Draft FS – FFA Date9/20/2013 PROPOSED REMEDIAL ACTION PLAN (PRAP) Submit Draft Proposed Plan – FFA Date 5/18/2014 RECORD OF DECISION (ROD)Submit Draft ROD – FFA Date1/28/2015
4
TaskFFA SubtaskDue Date SASE Submit Draft SASE Report - FFA Date 4/25/2011 FEASIBILITY STUDY (FS)Submit Draft FS - FFA Date1/31/2012 PROPOSED REMEDIAL ACTION PLAN (PRAP) Submit Draft PRAP - FFA Date9/27/2012 RECORD OF DECISION (ROD)Submit Draft ROD - FFA Date5/11/2013
5
TaskFFA SubtaskDue Date FEASIBILITY STUDY (FS) Submit Revised Draft FS - FFA Date 7/15/2011 PROPOSED REMEDIAL ACTION PLAN (PRAP) Submit Draft PRAP - FFA Date11/15/2011 RECORD OF DECISION (ROD)Submit Draft ROD - FFA Date4/20/2012
6
TaskFFA SubtaskDue Date DATA GAPS & RISK ASSESSMENT Submit Draft Data Gaps Work Plan - FFA Date 4/22/2011 Submit Draft Risk Report - FFA Date 1/19/2012 ENGINEERING EVALUATION/COST ANALYSIS (EECA) Submit Draft EECA - FFA Date9/15/2012 NON-TIME CRITICAL REMOVAL ACTION (NTCRA) Submit Draft Action Memo - FFA Date 4/13/2013 FEASIBILITY STUDY (FS) Submit Draft Focused FS - FFA Date 1/13/2013 PROPOSED REMEDIAL ACTION PLAN (PRAP) Submit Draft PRAP - FFA Date8/11/2013 RECORD OF DECISION (ROD)Submit Draft ROD - FFA Date2/8/2014
7
TaskFFA SubtaskDue Date DATA GAPS & RISK ASSESSMENT Submit Draft Data Gaps Work Plan - FFA Date 2/25/2011 Submit Draft Risk Report - FFA Date 2/15/2012 ENGINEERING EVALUATION/COST ANALYSIS (EECA) Submit Draft EECA - FFA Date10/12/2012 NON-TIME CRITICAL REMOVAL ACTION (NTCRA) Submit Draft Action Memo - FFA Date 4/25/2013 FEASIBILITY STUDY (FS) Submit Draft Focused FS - FFA Date 1/25/2013 PROPOSED REMEDIAL ACTION PLAN (PRAP) Submit Draft PRAP - FFA Date8/8/2013 RECORD OF DECISION (ROD)Submit Draft ROD - FFA Date2/5/2014 LAND USE CONTROL REMEDIAL DESIGN (LUC RD) Submit Draft LUC RD – FFA Date1/20/2014
8
TaskFFA SubtaskDue Date DATA GAPS & RISK ASSESSMENT Submit Draft Risk Report - FFA Date 2/15/2012 ENGINEERING EVALUATION/COST ANALYSIS (EECA) Submit Draft EECA - FFA Date10/11/2012 NON-TIME CRITICAL REMOVAL ACTION (NTCRA) Submit Draft Action Memo - FFA Date 4/24/2013 FEASIBILITY STUDY (FS) Submit Draft Focused FS - FFA Date 3/25/2013 PROPOSED REMEDIAL ACTION PLAN (PRAP) Submit Draft PRAP - FFA Date10/21/2013 RECORD OF DECISION (ROD)Submit Draft ROD - FFA Date4/20/2014
9
TaskFFA SubtaskDue Date REMEDIAL INVESTIGATION (RI)Submit Draft RI Report - FFA Date1/27/2011 FEASIBILITY STUDY (FS)Submit Draft FS - FFA Date10/6/2011 PROPOSED REMEDIAL ACTION PLAN (PRAP) Submit Draft PRAP - FFA Date8/1/2012 RECORD OF DECISION (ROD)Submit Draft ROD - FFA Date3/15/2013
10
TaskFFA SubtaskDue Date REMEDIAL INVESTIGATION (RI)Submit Draft RI Report - FFA Date1/27/2011 FEASIBILITY STUDY (FS)Submit Draft FS - FFA Date10/6/2011 PROPOSED REMEDIAL ACTION PLAN (PRAP) Submit Draft PRAP - FFA Date8/1/2012 RECORD OF DECISION (ROD)Submit Draft ROD - FFA Date3/15/2013
11
TaskFFA SubtaskDue Date PHASE 2 REMEDIAL INVESTIGATION (RI) Submit Draft P2 RI Report - FFA Date 12/28/2010 FEASIBILITY STUDY (FS)Submit Draft FS - FFA Date9/28/2011 PROPOSED REMEDIAL ACTION PLAN (PRAP) Submit Draft PRAP - FFA Date5/25/2012 RECORD OF DECISION (ROD)Submit Draft ROD - FFA Date12/22/2012
12
TaskFFA SubtaskDue Date REMEDIAL INVESTIGATION (RI) Submit Draft RI Work Plan – FFA Date 4/1/2012 Submit Draft RI Report – FFA Date 4/11/2013 ENGINEERING EVALUATION/COST ANALYSIS (EECA) Submit Draft EECA - FFA Date12/22/2013 NON-TIME CRITICAL REMOVAL ACTION (NTCRA) Submit Draft Action Memo - FFA Date 7/5/2014 FEASIBILITY STUDY (FS)Submit Draft FS - FFA Date9/3/2014 PROPOSED REMEDIAL ACTION PLAN (PRAP) Submit Draft PRAP - FFA Date4/16/2015 RECORD OF DECISION (ROD)Submit Draft ROD - FFA Date11/27/2015
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.