Team 7: Engineering an Alternate Route to Styrene
2
Larae Baker Adam Jones Michael Heslinga Jonathan Bush Maxine Bent
3
Outline Re-introduction Design Process Struggles Changes
4
Re-Introduction Design a styrene plant on HYSYS, a computer simulator –Capacity: 2 billion lbs/year –$0.70/lb –14% of US production New chemical process –Ethane instead of Ethylene
5
Design Process Research Base Case Detailed Equipment Design –Reactors –Separations –Other equipment Economic Optimization Finalized Design
6
Process Design
7
Struggle Separations –Not in patents –Heuristics No kinetic data –Cannot determine a rate law –Assumed conversion and selectivity
8
Changes since December Kinetics Working base case Optimization beginning Catalyst regeneration plan More detailed schedule Plant Details –50-60 acres –Texas/Louisiana