Presentation is loading. Please wait.

Presentation is loading. Please wait.

15.-17.March 2005 A.Fabich, CERN AB-ATB Introduction nToF11 collaboration meeting March 2005 A.Fabich CERN AB-ATB.

Similar presentations


Presentation on theme: "15.-17.March 2005 A.Fabich, CERN AB-ATB Introduction nToF11 collaboration meeting March 2005 A.Fabich CERN AB-ATB."— Presentation transcript:

1 15.-17.March 2005 A.Fabich, CERN AB-ATB Introduction nToF11 collaboration meeting March 2005 A.Fabich CERN AB-ATB

2 Agenda datetimepurposepersons requiredroom Tue 15th10:00-12:15CryogenicsF.Haug304 1-001 B 13:45-16:00visit TT2A P. Carbonez, A. Dorsival, S. Prodon, Y. Bernard, C. Lacroix & everybody interested ISR/TT2/TT2A 16:00-17:00transport Wed 16th 10:45-12:15SC/mercury loopA. Desirelli, J. Gulley304 1-001 A 13:45-15:15SC/power, solenoidF. Szoncso, F. Corsanego304 1-001 A 15:30-17:00SC/radiationT. Otto, M.Silari304 1-001 A Thu 17th9:00-10:30Power supplyC. Martins, K. Kahle304 1-001 A 10:45-12:15other issuescollaboration members304 1-001 A 13:45-15:15 mercury loop, diagnostics J.Lettry304 1-001 A 15:30-17:00 Summary on safety issues SC members304 1-001 A

3 Official representation CERN grey book, experiment database CERN grey book, experiment database http://greybook.cern.ch/ http://greybook.cern.ch/ See example of other experiments See example of other experiments According user’s office: According user’s office: Contact person: H.Haseroth Contact person: H.Haseroth Webpage Webpage greybook greybook Experimental (our own) Experimental (our own)

4

5 Control Room Contacts: Contacts: TSO: TSO: Knud.Dahlerup-Petersen@cern.ch (next to gallery under ISR) Knud.Dahlerup-Petersen@cern.ch (next to gallery under ISR) Robert.Magnin@cern.ch (stockage at antrance) Robert.Magnin@cern.ch (stockage at antrance) occupied 1 2

6 Beam windows Deflection by solenoid Deflection by solenoid Beam scan on purpose Beam scan on purpose Beam spot size at exit/entrance Beam spot size at exit/entrance Total beam loss; false steering of dipoles (see TT40 tests) Total beam loss; false steering of dipoles (see TT40 tests)

7 cryogenics preliminary results from M.Silari et al.: basic message basic message Ventilate to TT10 Ventilate to TT10 bg: 3.7 TBq bg: 3.7 TBq Activation of LN2 Activation of LN2 120 L 120 L 3.3 GBq @ 1 min 3.3 GBq @ 1 min 1.6 GBq @ 10 min 1.6 GBq @ 10 min 0.5 GBq @ 30 min 0.5 GBq @ 30 min Long-term contribution Long-term contribution ~10 ‰ of bg o.k. ~10 ‰ of bg o.k. spikes?? spikes?? If nToF running … If nToF running …

8 Organizational structure Inside Inside Outside Outside With persons from CERN groups etc. With persons from CERN groups etc.

9 Safety Definition of GLIMOS Definition of GLIMOS General linkman in matters of safety General linkman in matters of safety


Download ppt "15.-17.March 2005 A.Fabich, CERN AB-ATB Introduction nToF11 collaboration meeting March 2005 A.Fabich CERN AB-ATB."

Similar presentations


Ads by Google