OPERA brick (16215) scanning results Luisa Arrabito on behalf of Lyon Scanning Group Emulsion Workshop Nagoya 22th-23th January 2008
2
CC Event 186970035
3
SUMMARY Two Predictions from CS : 1) Muon X = 71339SX = -0.0418 Y = 18524SY = 0.0903 2) Other X = 68829SX = -0.2033 Y = 21576SY = 0.0894 Both tracks have been located in plate 57 CS-Brick Connection : 1) Muon DX = -47.5 µm DSX =4 mrad DY = -6 µm DSY = 5 mrad Grains = 25 2) Other DX = -101 µm DSX =14 mrad DY = 35.3 µm DSY =7 mrad Grains = 27
4
The brick was exposed to cosmics vertically 2 broad peaks are visible They correspond to transport tracks No alignment peak at nominal distance (1300 µm) for up to 4 cm 2
5
Scanback performed using X ray lateral marks Muon Other Stop in plate 50 ID_PLATE PATH Ncand 5311 5721 5411 5211 5711 5011 5111 5511 5611 Fill Factor = 100% Only 1 candidate for prediction within 100 μm and 30 mrad Scanback parameters : Pos tol. = (100 + 10*slope) μm Angular tol. = 0.015 + 0.05*slope Max missing plates = 5 ->Track stops in plate 57 -> High ionizing particle -> This is confirmed also in CS
6
SB Angular residuals SB Position residuals σ ~2.4 mrad RMS ~ 28 µm
7
Total Scan : Angular residuals Position residuals Scan of a large area 8 cm 2 - 16 cm 2 because of the low cosmics density x 5 plates upstream + 8 plates downstream σ ~7-8 mrad σ ~ 3 µm
8
Vertex confirmation Muon Vertex multiplicity 4 IDIP 1 0.22 µm 25.04 µm 3 2.47 µm muon 4 5.42 µm Pl 57 Total Scan efficiency ~80%
9
All tracks attached to the vertex were followed down Follow down parameters : Pos tol. = (100 + 10*slope) μm Angular tol. = 0.015 + 0.05*slope Max missing plates = 5 Fill Factor = 25/30 = 83% Only 1 candidate for prediction within 100 μm and 30 mrad Follow down Predictions sent to LNGS for confirmation in CS
10
Follow down angular residuals Follow down position residuals RMS ~ 22-29 µm σ ~ 3-4 mrad
11
Conclusions : The first CC event has been located in Lyon Lateral X ray very promising for ScanBack Some tests with a new dry objective and plate changer are going on A new Total Scan is going on in order to have standard format for publication Some more detailed analysis is going on (p measurement, …) Data publication will come soon A second OPERA brick will be in Lyon this week