Download presentation
Presentation is loading. Please wait.
1
NLC - The Next Linear Collider Project Discussion Detector Multiplicities & Timing Requirements Warm vs. Cold Tom Markiewicz SLAC ALCPG SLAC 8 January 2004
2
Tom Markiewicz NLC - The Next Linear Collider Project Backgrounds and IR Layouts Incoherent production of e+e- pairs. –# pairs scales with luminosity and is ~equal for both designs. –Detector occupancies depend on machine bunch structure and relevant readout time –IR Designs are similar in the use of tungsten shielding, instrumented masks, and low Z material –GEANT and FLUKA based simulations indicated that in both cases occupancies are acceptable TESLA-500JLC/NLC-500 N 2.0 x 10 10 0.75 x 10 10 xx 550 nm243 nm yy 5 nm3 nm zz 300 m110 m
3
Tom Markiewicz NLC - The Next Linear Collider Project NLC/TESLA Beam-Beam Comparison NLC500TESLA500 DyDy 1425 0.110.06 nn 1.171.6 bb 4.6%3.2% HDHD 1.42.1 # pairs/bunch 49,000130,000 _pair e4.1 GeV2.8 GeV #pairs/ sec1.1E91.8E9 #pairs/ Lum5.5 fm 2 5.3 fm 2 Larger z for TESLA More time for disruption larger luminosity enhancement more sensitivity to jitter Lower charge density lower energy photons
4
Tom Markiewicz NLC - The Next Linear Collider Project Detector Occupancies from e+e- Pairs @ 500 GeV fcn(bunch structure, integration time) DetectorPer bunchR. O.Eff #B OccupancyComment VXD-L136E-3/mm 2 50 s1485.3/ mm 2 1.5cm, 4T VXD-L23.1E-3/mm 2 250 s742 2.3/ mm 2 2.6cm, 4T TPC1336 , 5trks55 s160Few per mil Barrel ECAL 1176 , 0.63GeV150 ns 10.63 GeV101 >3MeV Endcap ECAL1176 , 1.29GeV150 ns 11.29 GeV91 >3MeV VXD-L138E-3/mm 2 8 ms1927.2/ mm 2 1.2cm, 3T VXD-L23.1E-3/mm 2 8 ms1920.6/ mm 2 2.4cm, 3T TPC1377 , ?trks8 ms192 “Few per mil” Needs Study Barrel ECAL 547 , 0.73 GeV 8 ms192139 GeV Needs Study Endcap ECAL597 , 0.9 GeV 8 ms192171 GeV Needs Study TESLATESLA NLCNLC TESLA=TDR; NLC=Snowmass 2001
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.